GROUTING METHOD FOR WATER-BEARING HORIZON ROCK DURING VERTICAL PIT SHAFT BUILDING Russian patent published in 2005 - IPC

Abstract RU 2258141 C1

FIELD: mining industry, particularly to protect mine workings against underground water ingress.

SUBSTANCE: method involves drilling injection wells along pit shaft perimeter; widening cracks by supplying high-pressure water and injecting grouting mortar in the cracks; additionally boring vertical preparation well in pit shaft center. Cracks are widened by feeding water and then air or only water in vertical preparation well. Water and air are supplied under pressure lesser than pressure of hydraulic rock fracturing. Grouting mortar is injected in cracks by forcing thereof through injection wells immediately after finishing of feeding water or air in vertical preparation well. Cryogenic gel is used as the grouting mortar. Cryogenic gel is foamed before injecting thereof in wells and foamed cryogenic gel is forced into cracks beyond the pit shaft perimeter by supplying compressed air in vertical preparation well. After leaving pit shaft as it is for grouting mortar setting time wells are sunk for the next grouting step depth and above operations are repeated up to reaching the lower boundary of pit shaft interval, wherein injection is performed under pressure exceeding that on previous step.

EFFECT: reduced labor inputs and material consumption along with increased efficiency of water suppression.

3 cl, 3 dwg, 1 ex

Similar patents RU2258141C1

Title Year Author Number
METHOD OF GROUTING ROCKS DURING THE CONSTRUCTION OF VERTICAL SHAFTS 2018
  • Kolontaevskij Evgenij Vladimirovich
  • Grokhov Evgenij Vitalevich
  • Bocharov Mikhail Viktorovich
  • Kosenko Evgenij Aleksandrovich
  • Mishedchenko Anatolij Anatolevich
RU2684629C1
METHOD FOR CONSTRUCTION OF MINE SHAFTS IN WATERED UNSTABLE ROCKS 1990
  • Kipko Ehrnest Jakovlevich[Ua]
  • Polozov Jurij Arkad'Evich[Ua]
  • Spichak Jurij Nikolaevich[Ua]
  • Vasil'Ev Vladimir Veniaminovich[Ua]
RU2095574C1
METHOD OF ROCKS GROUTING WITH NONUNIFORM JOINTING 2000
  • Khjamjaljajnen V.A.
  • Pampura V.M.
  • Bogatyrev V.D.
RU2183273C2
METHOD FOR PLUGGING ROCKS 0
  • Khyamyalyajnen Veniamin Anatolevich
  • Duda Evgenij Georgievich
  • Chernov Oleg Ignatevich
SU977789A1
METHOD OF PREPARING INUNDATED KIMBERLITE PIPE FOR UNDERGROUND MINING 1999
  • Kurlenja M.V.
  • Izakson V.Ju.
  • Vlasov V.N.
  • Vlasov I.N.
  • Klishin V.I.
RU2153072C1
METHOD FOR ERECTION OF ANTIFILTERING CURTAIN BEHIND CONTOUR OF MINE SHAFT IN POROUS ROCKS 0
  • Kipko Ernest Yakovlevich
  • Polozov Yurij Arkadevich
  • Shubin Andrej Anatolevich
SU1802135A1
METHOD OF HYDRO-ISOLATION AND CONSOLIDATION OF MOUNTAIN-MASS WHILE TUNNELING 0
  • Kipko Ernest Yakovlevich
  • Polozov Yurij Arkadevich
  • Spichak Yurij Nikolaevich
  • Levchinskij Grigorij Semenovich
  • Litovchenko Viktor Nikolaevich
  • Kipko Aleksandr Ernestovich
  • Shlyafer Vladimir Lazarevich
SU1830417A1
METHOD OF CONSTRUCTING ANTISEEPAGE CURTAINS 0
  • Mironenko Valerij Aleksandrovich
  • Atroshchenko Fedor Grigorevich
  • Rumynin Vyacheslav Genievich
  • Lobanov Viktor Vladimirovich
SU1507977A1
METHOD FOR CONTROLLING STANDARD OF PLUGGING IN ERECTION OF MINE WORKINGS 1991
  • Kipko Eh.Ja.
  • Polozov Ju.A.
  • Spichak Ju.N.
  • Vasil'Ev V.V.
RU2014463C1
DRILL HOLE PLUGGING-BACK METHOD 0
  • Mejrembaev Kabdy-Khakim Mauletbaevich
  • Boluchevskij Viktor Ivanovich
  • Vedyashkin Anatolij Sergeevich
SU1710699A1

RU 2 258 141 C1

Authors

Ushakov V.Ja.

Dates

2005-08-10Published

2004-05-25Filed