FIELD: heat power engineering.
SUBSTANCE: invention can be used for simultaneous generation of thermal and electric energy and can be used for modernization of existing water heating boiler plants in mini-and-heating plants. Hot water from boiler 1 is delivered along heat supply system 2 by means of system pump 3 to consumer. Flue gases are removed from boiler 1 along smoke stack 5 which accommodates heat exchanger 17 of intermediate heating circuit 15. Intermediate heat carrier is heated by flue gases and is delivered by compressor 16 into heater 7 of Stirling engine 6 where it transfers heat of exhaust gases to gaseous working medium of Stirling engine 6, Stirling engine 6 transforms received high-temperature heat into mechanical energy by means of which electric generator 11 is set into operation to generate electric energy. Make up water line 9 passes through cooler of Stirling engine 6 for cooling the engine. Delivery of make up water is provided by pump 10.
EFFECT: possibility of generation of additional electric energy, reduced cost and increased efficiency of power and heating system when water heating boiler plant is changed into mini-power-heating plant.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
COGENERATION SYSTEM BASED ON STEAM BOILER PLANT WITH USE OF HEAT OF WASTE GASES | 2004 |
|
RU2278279C2 |
OPERATING METHOD OF HOT-WATER BOILER | 2019 |
|
RU2716202C1 |
SYSTEM FOR PRODUCTION OF THERMAL AND ELECTRICAL ENERGY BASED ON AN EXTERNAL COMBUSTION ENGINE | 2020 |
|
RU2755072C1 |
COMBINATION HEAT AND POWER GENERATING PLANT | 2006 |
|
RU2300636C1 |
CONSUMER WATER HEATING SYSTEM | 2014 |
|
RU2557156C1 |
METHOD FOR OPERATION OF BINARY COMBINED CYCLE POWER PLANT | 2016 |
|
RU2631961C1 |
METHOD OF WORK OF BINARY STEAM HEAT ELECTROCENTRAL | 2016 |
|
RU2626710C1 |
BOILER HOUSE | 2022 |
|
RU2815593C2 |
CONDENSATION BOILER PLANT (VERSIONS) | 2012 |
|
RU2489643C1 |
BOILER HOUSE | 2023 |
|
RU2798634C1 |
Authors
Dates
2005-09-27—Published
2004-04-21—Filed