FIELD: test equipment.
SUBSTANCE: method can be used for inspecting integrity long eclectic supply lines of distributed or parallel-series load, for example, cities and enterprises lighting utilities. To state the open-circuit in electric power line and to find the exact point where it happened, the measured power is compared subsequently with predetermined values of power with specified values of power for model versions of open-circuited lines. Maximal coincidence is selected which points at fact that the line is open-circuited. Identification mark of selected model version of open circuit identifies part of open-circuited line of power line of distributed load. According to the method, the only one power meter of several lines with electric load can be used.
EFFECT: improved efficiency of operation.
1 tbl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM FOR CONTROLLING INTEGRITY OF ELECTRIC POWER LINES WITH DISTRIBUTED LOAD | 2004 |
|
RU2269788C1 |
METHOD FOR AUTOMATIC DETECTION OF FAULTY LOADS DISTRIBUTED ALONG POWER SUPPLY LINE | 2008 |
|
RU2390106C1 |
APPLICATION OF AN ACCOUNTING SYSTEM OF CONSUMPTION OF ELECTRIC ENERGY IN QUALITY OF A SYSTEM OF DETECTION OF TEMPORARY UNSANCTIONED SWITCHING TO THE LINES OF ELECTRIC LIGHTING | 2004 |
|
RU2279683C2 |
METHOD OF ESTIMATING ACTIVATION ENERGIES OF DIFFUSION OF OXYGEN IONS IN A MEMRISTOR FILAMENT | 2019 |
|
RU2729978C1 |
MODULAR ENGINEERING SYSTEM | 2006 |
|
RU2363973C2 |
UNIVERSAL STABILIZER-POWER SUPPLY REGULATOR WITH ENERGY SAVING FUNCTION | 2021 |
|
RU2771666C1 |
LIGHTING CONTROL SYSTEM | 2023 |
|
RU2804930C1 |
METHOD OF CONSTRUCTING SPACECRAFT | 2013 |
|
RU2535824C2 |
AUTONOMOUS DEVICE FOR AUTOMATIC DETECTION OF BROKEN CONDUCTORS OF EXTENDED POWER CABLE | 2023 |
|
RU2815609C1 |
CROSS SIGNAL CONTROL SYSTEM | 2021 |
|
RU2758627C1 |
Authors
Dates
2005-09-27—Published
2004-03-17—Filed