FIELD: motor road repair device, particularly to replace pipe culverts.
SUBSTANCE: method involves providing temporary water flow offtake, installing new pipe inside the defective one and filling gap between defective pipe and new pipe with concrete grout. Temporary support with upper plate is placed into defective pipe before new pipe installation, wherein the support is arranged in damaged pipe area and is fixed inside it. New pipe parts are introduced in defective one from two opposite ends thereof up to bringing the parts into close contact. Both parts have freeing means for temporary support receiving. Ends of above pipe parts are connected one to another and to temporary support to create new pipe. The gap between defective pipe and the new pipe is filled with concrete grout and after that temporary support is removed.
EFFECT: reduced labor inputs, possibility to repair pipe culvert without disassembling thereof.
14 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REPAIR OF PIPE CULVERT UNDER EARTHFILL | 2009 |
|
RU2406797C1 |
MAINTENANCE METHOD FOR PIPE CULVERT | 2007 |
|
RU2341612C1 |
METHOD FOR REPAIR OF PIPE CULVERT UNDER BANK | 2011 |
|
RU2479688C2 |
METHOD OF PERFORMING WORKS ON REPLACEMENT OF EXISTING PIPE | 2018 |
|
RU2706494C1 |
METHOD FOR BEAM BRIDGE RECONSTRUCTION | 2005 |
|
RU2302491C1 |
WATER CULVERT | 0 |
|
SU1719526A1 |
CULVERT UNDER THE EMBANKMENT | 2017 |
|
RU2660699C1 |
GRANULAR-FILL STRUCTURE LOCATED UNDER EMBANKMENT | 2003 |
|
RU2255168C2 |
METHOD OF CULVERT REPLACEMENT | 2001 |
|
RU2183230C1 |
CULVERT (VARIANTS) AND METHOD FOR ITS CONSTRUCTION | 2005 |
|
RU2303096C2 |
Authors
Dates
2005-12-10—Published
2004-04-20—Filed