FIELD: the installation for production of cement clinker refers to construction equipment.
SUBSTANCE: the installation for production of cement clinker includes a heater which has at least one last cyclone and at least one next to last cyclone which is successively connected with the last cyclone with the help of a gas channel and in which the gas is fed from the last cyclone, a calcinator which has at least one inlet opening for feeding heated mixture of raw materials from the last cyclone and which is connected with the next separating cyclone, a gas channel which connects the separating cyclone with the last cyclone and which includes at least one inlet opening for feeding heated mixture of raw materials from the last to next cyclone. The inlet opening for feeding heated mixture of raw materials from the next to last cyclone into the gas channel which connects the separating cyclone with the last cyclone, in the vertical flatness it is at least under at least one inlet opening for feeding heated mixture of raw materials from the last cyclone into the calcinator . The technical result is in that not touching upon the mounting altitude of the heater it is possible to mount the last cyclone of the heater at random altitude relatively to the calcinator .
EFFECT: the heated mixture of raw materials may be fed in any sector of the calcinator without using hoisting equipment.
4 dwg
Authors
Dates
2006-01-20—Published
2001-07-19—Filed