FIELD: building, particularly to repair and maintain motor roads with cracks generated due to temperature change in autumn and winter periods.
SUBSTANCE: method involves stripping upper carpet layer along crack propagation direction; preparing base; pouring out bitumen and laying repair material in trench; forming artificial crack in newly-laid repair material layer along crack direction by installing channeling device having T-shaped cross-section and wedge-like cutting edge; evening repair material so that repair material surface is at height equal to cutting edge height and compacting thereof; removing the channeling device and filling the artificial crack with bitumen-based mastic.
EFFECT: increased crack-resistance, reduced costs and labor inputs for cracked asphalt carpet repair.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
ROAD SCRAPER FOR JOINTING CRACKS IN ASPHALT CARPETS | 2010 |
|
RU2439241C2 |
METHOD TO REPAIR ASPHALT-CONCRETE SURFACES | 2012 |
|
RU2501903C1 |
METHOD FOR ASPHALT PAVEMENT REPAIR | 0 |
|
SU1825836A1 |
GEOLOGICAL REINFORCING INTERLAYER ( VARIANTS ) | 2001 |
|
RU2186906C1 |
ASPHALT CONCRETE COATING REPAIR METHOD | 2003 |
|
RU2267571C2 |
COMPOSITION FOR REPAIR OF ASPHALT COVERING | 2007 |
|
RU2352599C2 |
METHOD OF PATCHING ROAD PAVEMENT | 2018 |
|
RU2740138C2 |
METHOD FOR USE OF MEGALOPOLIS HIGHWAY | 1998 |
|
RU2140479C1 |
BITUMEN COMPOSITION AND A METHOD FOR PRODUCTION THEREOF | 2018 |
|
RU2696476C1 |
COLD METHOD FOR PRODUCING EXTRA STRENGTH STONE MASTIC ASPHALT CONCRETE FOR REPAIRING AND SETTING UP LAYERS OF ROAD SURFACE | 2015 |
|
RU2612681C1 |
Authors
Dates
2006-02-27—Published
2004-04-09—Filed