FIELD: mining, particularly to consolidate or to protect pit sides against landslide during pit operation.
SUBSTANCE: method involves laying transversal members connected to ropes along slope, wherein the ropes are fixedly secured to anchors located in upper bench berm; drilling inclined wells extending to bench slope; installing next anchor along lower edge of upper berm and drilling next inclined well cluster. Suspending net to bench slope and pulling down ropes from upper berm through drilled inclined wells so that the first rope ends extend from bench slope; lowering the rope ends to lower berm and securing thereof to transversal members arranged above the net, wherein the transversal members are installed beginning from lower berm; tightening the ropes and fastening the second rope ends to anchors.
EFFECT: increased operational safety and decreased labor inputs for bench slope consolidation.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
OPEN-PIT BENCH REINFORCEMENT METHOD | 2011 |
|
RU2477372C1 |
ESCARPMENT REINFORCEMENT METHOD | 2011 |
|
RU2477352C1 |
METHOD FOR RESTORING BROKEN BENCHES DURING OPERATIONS IN A PIT | 2003 |
|
RU2241120C1 |
METHOD TO PROVIDE FOR STABILITY OF HIGH LEDGES | 2008 |
|
RU2392434C1 |
METHOD FOR REINFORCING SLANTS OF SLOPES | 2002 |
|
RU2239062C2 |
METHOD FOR INCREASING STABILITY OF QUARRY BORDER LEDGES | 2003 |
|
RU2237165C1 |
0 |
|
SU535390A1 | |
ROPE-AND-GAUZE CURTAIN OF FLANK OF OPENCAST | 2002 |
|
RU2213182C1 |
METHOD OF STRENGTHENING LEDGE BERM | 2023 |
|
RU2810374C1 |
REINFORCEMENT METHOD OF BANK SLOPES BY USING WIRE ROPE SYSTEM | 2015 |
|
RU2622933C1 |
Authors
Dates
2006-05-27—Published
2004-10-25—Filed