FIELD: mining, particularly underground flat-laying seam excavation with selective mineral excavation.
SUBSTANCE: method involves selectively excavating mineral in several cuts; controlling roof and arranging the cut rock interlayer in goaf; laying U-shaped boxes on seam ground so that the boxes are transversal to seam ground and are behind breakage face line, wherein the U-shaped boxes have surface opened towards seam roof; filling the boxes with gob from complex seam interlayers; laying pneumocylinder on the rock; supplying compressed air and compacting gob; unloading pneumocylinder; laying next U-shaped box on previously laid pneumocylinder, wherein the next box has dimensions exceeding that of previous one to create closed loop; supplying compressed air in pneumocylinder to expand U-shaped boxes between seam roof and ground; laying wooden washers on lower U-shaped box flanges along pneumocylinder sides, wherein wooden washers have heights exceeding that of deflated pneumocylinders; unloading and removing pneumocylinders after roof rock lowering so that upper box touches wooden washers.
EFFECT: decreased mineral losses and increased roof control efficiency.
8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COMPOSITE FORMATIONS HAVING GOB LAYERS DEVELOPMENT | 2005 |
|
RU2281394C1 |
DEVELOPMENT METHOD FOR COMPOSITE FORMATIONS HAVING GOB INTERLAYERS | 2005 |
|
RU2277170C1 |
DEVELOPMENT METHOD OF COMPOSITE BEDS WITH WASTE ROCK INTERLAYERS | 2007 |
|
RU2345218C1 |
DEVELOPMENT METHOD FOR COMPOSITE SEAMS CHARACTERIZED BY GOB LAYERS | 2005 |
|
RU2276265C1 |
METHOD FOR UNDERGROUND FLAT-LAYING MINERAL SEAM MINING | 2006 |
|
RU2309250C1 |
UNDERGROUND MINING METHOD OF FLAT BEDS OF MINERAL RESOURCES | 2007 |
|
RU2345220C1 |
METHOD FOR UNDERGROUND FLAT SEAM MINING | 2005 |
|
RU2276264C1 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
ROOF CONTROL METHOD | 2005 |
|
RU2283958C1 |
ROOF CONTROL METHOD | 2005 |
|
RU2298100C1 |
Authors
Dates
2007-10-27—Published
2006-05-31—Filed