FIELD: mining art, applicable for charging of deep holes at blasting in mining art and in construction.
SUBSTANCE: the method consists in production of air gaps with the aid of deep-hole gates whose diameter exceeds the deep-hole diameter, lowering of them into the deep hole to a preset depth, installation of live primers in each deep hole, installation of the detonating cord. Air gaps are produced with the aid of an elastic deep-hole gate, which in the deformed state is placed in a transportation container and on a rod rigidly linked with the transportation container. They are lowered into the deep hole that is adjusted with the aid of the rod, where the elastic deep-hole gate is pushed out of the transportation container. The transportation container is taken out of the deep hole, and the live primer and a portion of the charge is placed on the elastic deep-hole gate. Then, the same elastic deep-hole gate in a deformed state is placed into the next transportation container, lowered into the deep hole to a preset depth and all operations are repeated in the same sequence up to the feasibility studied quantity of elastic gates in the deep hole.
EFFECT: reduced labor content of deep-hole charging by distributed charges, reduced specific cost of the gate of the ultimate cost of the installed charge, reduced cost of deep-hole charging by distributed charges, simplified process of charge distribution in a deep-hole.
4 dwg, 1 ex
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD FOR DISTRIBUTION OF CHARGE IN A DEEP HOLE | 2005 | 
 | RU2285896C1 | 
| METHOD FOR CHARGE DISPERSAL IN BOREHOLE | 2006 | 
 | RU2319924C1 | 
| METHOD FOR CHARGE DISPERSAL IN HOLE | 2008 | 
 | RU2379621C1 | 
| METHOD OF DISPERSION OF A CHARGE IN A BOREHOLE | 2003 | 
 | RU2235971C1 | 
| METHOD FOR DISPERSAL OF CHARGE IN WATERED WELL AND DEVICE FOR ITS REALISATION | 2008 | 
 | RU2374603C1 | 
| BOREHOLE CHARGE DISPERSION DEVICE | 2021 | 
 | RU2756035C1 | 
| DEVICE FOR CREATING GAP IN WELL | 2020 | 
 | RU2751763C1 | 
| FORMATION METHOD OF COMPOUND BLAST | 2008 | 
 | RU2364828C1 | 
| METHOD OF CHARGE DE-CONCENTRATION OF EXLOSIVE MATERIAL IN BOREHOLE | 2007 | 
 | RU2362114C2 | 
| COMBINED CHARGE SHAPING METHOD | 2010 | 
 | RU2425324C1 | 
Authors
Dates
2006-10-20—Published
2005-02-25—Filed