FIELD: engineering of systems for controlling and monitoring technological processes.
SUBSTANCE: method contains following operations: independent values being observed {G1(t),...Gp(t)} are measured; by means of prediction model M or a line of models, input variables of which contain independent values being observed, estimate Res(t)=M(G1(t),...Gp(t)) of result R(t) is performed; by means of application of control rule L, input variable of which is estimate result Res(t), new given values {C1(t+1),... Cn(t+1)}=(Res(t)), are computed, useable up to moment t+1; and values {C1(t),... Cn(t)} are replaced with values {C1(t+1),... Cn(t+1)}, while prediction model is a statistic correcting model.
EFFECT: provision of monitoring and control in continuous mode over technical process, wherein it is impossible to observe produced result.
17 cl, 6 dwg
Authors
Dates
2006-12-20—Published
2002-02-12—Filed