FIELD: mechanical engineering; load-lifting facilities.
SUBSTANCE: proposed method includes lifting of section to be mounted by crane to level of opening of mounting holder and crane tower aperture, fixing of section to be mounted and bringing it into aperture of tower by turning, mounting of section in designed vertical position and connecting section and tower. Section to be mounted is lifted ion horizontal position, and in this position upper edge of section arranged close to tower, is hinge-connected with mounting holder or with upper part of crane. Then, using crane, section is lowered until it is free hanging on hinge joint and turned to tower into designed position.
EFFECT: reduced labor input at mounting operations, improved safety and simplified design.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
TOWER CRANE WITH TOWER EXTENDING DEVICE AND TOWER EXTENDING DEVICE OF TOWER CRANE | 2005 |
|
RU2314249C2 |
METHOD OF RISING TOWER OF TOWER CRANE | 2008 |
|
RU2375296C1 |
TOWER CRANE BOOM | 2000 |
|
RU2225831C2 |
TOWER CRANE BOOM | 2000 |
|
RU2225830C2 |
WEDGE CONNECTION OF TOWER CRANE SECTION CHORDS | 2003 |
|
RU2257335C1 |
METHOD OF INCREASING HEIGHT OF CRANE TOWER | 2002 |
|
RU2225347C1 |
DEVICE FOR INCREASING HEIGHT OF CRANE TOWER | 2002 |
|
RU2225348C1 |
BUTT JOINING OF METAL STRUCTURES, PARTICULARLY, TOWER SECTIONS OF TOWER CRANES | 2001 |
|
RU2212374C2 |
TOWER CRANE AND METHOD OF ITS MOUNTING AND DISMANTLING | 2006 |
|
RU2333883C1 |
TOWER CRANE AND METHOD OF ITS MOUNTING | 1998 |
|
RU2225346C2 |
Authors
Dates
2007-01-10—Published
2005-06-27—Filed