FIELD: transport.
SUBSTANCE: tower crane incorporates a crane boom with lifting hook arranged atop the tower, a boom head and a balancer cantilever, a crane boom turning mechanism to move along the tower, a tower advancing cage arranged beneath the aforesaid boom turning mechanism, wall-mounted supports with one end linked to the tower and the other one jointed to the building, wall-mounted supports assembly and disassembly appliances fitted on the crane. The assembly and disassembly appliance furnished with a drive provided with a load-lifting element on its end is fastened to the tower advancing cage and represents a cantilever turning about the cage in the horizontal plane. The cantilever is fitted on the cage so that, on turning, its load gripping appliance is located in either the tower crane hook range or the wall-mounted support ends area, the said wall-mounted supports being located nearby the crane tower. The proposed device allows mounting and dismantling of the tower crane.
EFFECT: higher crane efficiency due to time- and labor-savings in mounting and dismantling, higher safety of mounting and dismantling.
2 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
TOWER CRANE WITH TOWER EXTENDING DEVICE AND TOWER EXTENDING DEVICE OF TOWER CRANE | 2005 |
|
RU2314249C2 |
TOWER CRANE AND METHOD OF ITS MOUNTING | 2001 |
|
RU2225345C2 |
METHOD OF EXTENDING HEIGHT OF TOWER OF TOWER CRANE | 2005 |
|
RU2291101C1 |
METHOD OF RISING TOWER OF TOWER CRANE | 2008 |
|
RU2375296C1 |
TOWER CRANE AND METHOD OF ITS MOUNTING | 1998 |
|
RU2225346C2 |
LEAN-TO TOWER CRANE | 1997 |
|
RU2118289C1 |
TOWER CRANE AND METHOD OF ITS MOUNTING AND DEMOUNTING | 2001 |
|
RU2225344C2 |
DEVICE FOR INCREASING HEIGHT OF CRANE TOWER | 2002 |
|
RU2225348C1 |
DEVICE FOR INCREASING HEIGHT OF CRANE TOWER | 2002 |
|
RU2225349C1 |
LOADING CRANE | 1999 |
|
RU2172291C2 |
Authors
Dates
2008-09-20—Published
2006-12-15—Filed