FIELD: oil and gas extractive industry, namely, bindings for gas wells, positioned on multiple well platforms, in case of multiple well drilling method and deposit extraction.
SUBSTANCE: binding includes column head, tubular head with side working and reserved outlets, fountain tree with working and reserved strings, exhaust lines with measuring plant and narrowing device, torch line, gas-gathering collector. Mouths of wells are positioned on multiple well platform at equal distance from each other. Working and reserved strings of fountain trees are positioned in parallel to well axis. Narrowing device is mounted on each exhaust line in front of place where its connected to gas-gathering collector. Exhaust line is equipped with cutting valve. Torch line and gas-gathering collector are directed in mutually opposite directions. Measuring plant, common for all wells, is positioned on gas-gathering collector via bypass connection.
EFFECT: increased reliability and serviceability of binding.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
WELLHEAD CONNECTIONS OF HIGH-OUTPUT OIL WELL WITH ANNULAR GAS SHOW | 2014 |
|
RU2547185C1 |
WELLHEAD CONNECTIONS OF LOW-OUTPUT OIL WELL WITH ANNULAR GAS SHOW | 2014 |
|
RU2546686C1 |
WELLHEAD EQUIPMENT FOR DEEP GAS-CONDENSATE WELL OPERATION | 2006 |
|
RU2315852C1 |
ABANDONMENT METHOD OF OIL-AND-GAS WELL LOCATED IN WATER AREA OF SHALLOW WATER RESERVOIR | 2009 |
|
RU2418152C1 |
RE-EQUIPMENT OF SELF-SQUEEZING GAS WELL HEAD | 2013 |
|
RU2524787C1 |
WELL CLUSTER OF HYDROCARBON RAW MATERIAL DEPOSIT | 2010 |
|
RU2453684C1 |
WELL OF HYDROCARBON RAW MATERIAL DEPOSIT | 2010 |
|
RU2453687C1 |
METHOD FOR MAINTAINING RESERVOIR PRESSURE OF AN OIL WELL | 2018 |
|
RU2684791C1 |
METHOD FOR HYDRAULIC RESERVOIR FRACTURING INSIDE GAS WELL | 2005 |
|
RU2306412C1 |
HERMETIC SEALING TECHNIQUE FOR THREADED CONNECTION OF DIRECTOR CLUTCH AND TUBING HEAD INSTALLATION TUBE AT WELL WITHOUT OVERHAULING | 2014 |
|
RU2541007C1 |
Authors
Dates
2007-01-10—Published
2005-06-20—Filed