SHELL PILE WITH FILLER MATERIAL Russian patent published in 2014 - IPC E02D5/30 

Abstract RU 2523264 C2

FIELD: construction.

SUBSTANCE: shell pile with filler fixed inside the pile and cap on the top, installed in permafrost soil, with internal cavity filled with nonfrost-susceptible material. The cavity is filled partially, just above the level of lower boundary of layer of seasonal freezing and thawing of the soil, in this case the upper surface of filler is sealed against the ingress of water.

EFFECT: increase of pile reliability, reduction of material consumption when manufacturing the piles, work cheapening.

10 cl, 2 dwg

Similar patents RU2523264C2

Title Year Author Number
METHOD TO PROTECT SUPPORT ELEMENTS FROM FROST HEAVING OF SOIL (VERSIONS) 2012
  • Khafizov Robert Mijassarovich
RU2515246C1
METHOD TO INSTALL TUBULAR PILE IN PERMAFROST SOIL AT NEGATIVE AMBIENT TEMPERATURE (VERSIONS) 2010
  • Khafizov Robert Mijassarovich
RU2419707C1
DEVICE FOR PROTECTION AGAINST HEAVE 2014
  • Khafizov Robert Mijassarovich
RU2582600C1
METHOD FOR PILE DRIVING IN PERMAFROST GROUND (VARIANTS) 2005
  • Khafizov Robert Mijassarovich
RU2295608C2
SLAB FOUNDATION 2013
  • Khafizov Robert Mijassarovich
RU2536527C2
FOUNDATION SLAB STRENGTHENED WITH SHELL IN PERMAFROST SOIL 2013
  • Khafizov Robert Mijassarovich
RU2541692C2
METHOD FOR ERECTING PILES IN PERMAFROST GROUND 1993
  • Khafizov Robert Mijassarovich
RU2039158C1
EXPANSION ANCHORING DEVICE FOR PIPELINE 1994
  • Khafizov Robert Mijassarovich
RU2079030C1
METHOD OF ARRANGEMENT OF FOUNDATION SLAB ON PILES FOR LOW-TEMPERATURE PRODUCT TANK 2013
  • Khafizov Robert Mijassarovich
RU2552253C1
METHOD FOR SINKING SCREW PILES INTO PERMAFROST SOIL 2016
  • Khafizov Robert Miyassarovich
RU2630338C1

RU 2 523 264 C2

Authors

Khafizov Robert Mijassarovich

Dates

2014-07-20Published

2012-11-07Filed