FIELD: construction, particularly roof structures.
SUBSTANCE: roof assembly comprises roofing with gutter secured by hooks connected to roofing surface. The gutter is fastened to hooks by means of slot. Device also has deicing covering extending downwards from the gutter and projected from lower roofing edge and clip fixed in space between the hooks and the slot made in gutter. Clip edge is embedded in bend formed in upper edge of the deicing covering. Device also has electricity-conductive bundle located under deicing covering along gutter edge and connected with power source. In the case of gutter overfilling snow water flows downwards along deicing covering to prevent ice and icicle formation on lower roofing edge.
EFFECT: decreased ice formation of lower roof edge.
5 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE TO PROTECT BUILDING ROOF AGAINST ICE AND ICICLE FORMATION | 2006 |
|
RU2310727C1 |
DEVICE FOR BUILDING ROOF PROTECTION AGAINST ICE AND ICICLES | 2005 |
|
RU2291261C1 |
ROOF STRUCTURE FOR BUILDING | 2005 |
|
RU2283930C1 |
ARANGEMENT OF BUILDING AND STRUCTURE ROOF | 2007 |
|
RU2338853C1 |
ARRANGEMENT OF BUILDING AND STRUCTURE ROOF | 2012 |
|
RU2494199C1 |
DEVICE FOR PROTECTION OF STRUCTURE ROOF AGAINST FORMATION OF ICE CRUST AND CLOGGING OF GUTTERS | 2007 |
|
RU2353739C1 |
ANTI-ICING ROOFING OF SLOPING OR CONDITIONALLY FLAT ROOFS, RECONSTRUCTION METHOD FOR EXISTENT OUTER ORGANIZED WATER DRAINAGE SYSTEM, WHICH DRAINS WATER, PREFERABLY WATER FROM MELTED SNOW, FROM INCLINED METAL ROOFING, AND ANTI-ICING WALL GUTTER FOR ABOVE RECONSTRUCTION REALIZATION | 2005 |
|
RU2301869C2 |
METHOD FOR ADHESION FORCE REDUCTION IN FREEZING LIQUID | 2005 |
|
RU2278223C1 |
DEVICE TO REMOVE ICE AND SNOW FROM ROOF | 2013 |
|
RU2532048C1 |
DEVICE TO REMOVE ICE AND ICICLES FROM CORNICES OF BUILDING ROOFS, STRUCTURES AND AROUND HOPPER HEADS | 2011 |
|
RU2509190C2 |
Authors
Dates
2007-04-10—Published
2005-08-02—Filed