FIELD: construction, particularly to erect cast-in-place building structures, namely bridge and tunnel roadway pavings and other elongated structures, without control joints.
SUBSTANCE: contraction joint comprises partition extending for the full reinforced concrete member cross-section length and transversal reinforcement. Longitudinal reinforcement is made as continuous bars in member cross-section near the joint. Partition is made as sheet transversal to longitudinal reinforcement direction and provided with anchors connected to one sheet side. Contraction joint also has additional reinforcement anchors fastened in pairs to all continuous bars of longitudinal reinforcement so that each additional anchor is located from each side of the partition and spaced 1a distance from it. The distance 1a is determined from condition of comparability of total continuous reinforcement bar resiliency value determined in above area with resiliency of reinforced concrete member having L length. Cross-sectional area Fr of all continuous reinforcement bars is determined from condition of compatibility of separate longitudinal reinforcement tensile strength and total reinforced concrete member tensile strength, wherein reinforced concrete member cross-sectional area is equal to fb. Summary area Fr of continuous longitudinal reinforcement bars and length la of the area is determined from corresponding relations.
EFFECT: increased reliability and service life of elongated monolithic building structures erected without control joints.
2 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
EXPANSION-SHRINKAGE JOINT | 2001 |
|
RU2202673C2 |
METHOD FOR ERECTION OF CONCRETE BRIDGE PIER | 2000 |
|
RU2165491C1 |
METHOD FOR PRECAST CONCRETE AND REINFORCED CONCRETE BUILDING STRUCTURE PRODUCTION AND FOR CAST-IN-PLACE CONCRETE AND REINFORCED CONCRETE BUILDING STRUCTURE ERECTION | 2004 |
|
RU2273707C1 |
METHOD FOR FORM REMOVAL FROM CONCRETE MASSIVE STRUCTURES | 2000 |
|
RU2172808C1 |
CAST-IN-PLACE TWO-LAYERED REINFORCED CONCRETE PANEL | 2003 |
|
RU2243316C1 |
PRESTRESSED SOLID STEEL SPAN STRUCTURE OF A BRIDGE AND METHOD OF ITS MANUFACTURING | 2018 |
|
RU2701258C1 |
PROCESS OF ERECTION OF MONOLITHIC REINFORCED CONCRETE BRIDGE SUPPORTS-WALLS | 2001 |
|
RU2208082C2 |
HYDRAULIC SIMULATOR | 0 |
|
SU564639A1 |
PROCESS OF ERECTION OF FLOORS OF MONOLITHIC REINFORCED BUILDING STRUCTURES | 2001 |
|
RU2206679C2 |
PROCESS OF LAYING CONCRETE ON MONOLITHIC REINFORCED CONCRETE BUILDING STRUCTURES EXTENDED IN AREA | 2001 |
|
RU2211892C2 |
Authors
Dates
2007-05-27—Published
2005-10-18—Filed