FIELD: construction engineering; erecting massive concrete piers and other structures. SUBSTANCE: method involves removal of form and heat insulation. First form and heat insulation are removed from one of side walls of massive concrete structure. Then heat insulation is reinstalled on structure; in a certain time interval τ1 form and heat insulation are removed from opposite side of concreted structure and then heat insulation is reinstalled. After that same procedure is made with two other opposite sides of structure. Time interval τ1 is found from equation τ1≥ m3τ, day, where τ is time taken to simultaneously remove form and heat insulation from one side of structure and to reinstall heat insulation on structure, m = 1±0,3 is coefficient of work conditions. EFFECT: reduced time required for form removal; provision for reuse of form. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF CONCRETE BRIDGE PIER | 2000 |
|
RU2165491C1 |
METHOD FOR PRECAST CONCRETE AND REINFORCED CONCRETE BUILDING STRUCTURE PRODUCTION AND FOR CAST-IN-PLACE CONCRETE AND REINFORCED CONCRETE BUILDING STRUCTURE ERECTION | 2004 |
|
RU2273707C1 |
SHUTTERING PANEL | 1998 |
|
RU2149243C1 |
CAST-IN-PLACE TWO-LAYERED REINFORCED CONCRETE PANEL | 2003 |
|
RU2243316C1 |
METHOD FOR ERECTION OF BRIDGE SUPPORT PILLAR ON PERMAFROST | 2009 |
|
RU2455418C2 |
EXPANSION-SHRINKAGE JOINT | 2001 |
|
RU2202673C2 |
PROCESS OF ERECTION OF MONOLITHIC REINFORCED CONCRETE BRIDGE SUPPORTS-WALLS | 2001 |
|
RU2208082C2 |
METHOD FOR ERECTION OF BRIDGE SUPPORT PILLAR ON PERMAFROST | 2009 |
|
RU2455419C2 |
PROCESS OF ENCASEMENT OF MONOLITHIC REINFORCED CONCRETE BUILDING STRUCTURE EXTENDED IN AREA IN CONCRETE | 2001 |
|
RU2208083C2 |
CONTRACTION JOINT | 2005 |
|
RU2299946C1 |
Authors
Dates
2001-08-27—Published
2000-02-15—Filed