FIELD: drilling and blasting operations, applicable in various branches using blasting operations in hard rock masses.
SUBSTANCE: the method consists in a preliminary arrangement of a water-proofing casing in dry borehole, forming of a non-water-proof explosive charge in it and tamping of the borehole over the water-proofing casing. Air gaps of foamed polystyrene are formed in the water-proofing casing between the parts of the dispersed explosive charge and between the upper part of the explosive charge and the stemming.
EFFECT: enhanced efficiency of the blast breaking of rocks.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMING OF SPACE-CHARGE OF EXPLOSIVES IN PARTIALLY FLOODED HOLES | 2006 |
|
RU2310158C1 |
METHOD TO FORM MULTICHARGE IN DROWNED WELL | 2010 |
|
RU2449241C1 |
METHOD FOR FORMING OF COMPOSITE CHARGE IN PARTIALLY FLOODED BOREHOLE | 2006 |
|
RU2314486C1 |
METHOD OF FORMING DIVIDED CHARGES IN FLOODED WELLS | 2006 |
|
RU2306523C1 |
METHOD FOR FORMING OF COMBINED CHARGE AND METAL STEMMING FOR ITS REALIZATION | 2006 |
|
RU2312300C1 |
FORMATION METHOD OF COMPOUND BLAST | 2008 |
|
RU2364828C1 |
METHOD OF FORMING DIVIDED CHARGES IN FLOODED WELLS | 2006 |
|
RU2306522C1 |
METHOD FOR FORMATION OF AIR GAPS BY ELEMENTS OF FOAM POLYSTYRENE | 2006 |
|
RU2319922C2 |
METHOD FOR FORMING OF AIR GAPS BY ELEMENTS OF FOAM POLYSTYRENE | 2006 |
|
RU2317519C1 |
METHOD OF CHARGE DISPERSAL IN WELL | 2006 |
|
RU2325617C2 |
Authors
Dates
2008-01-10—Published
2006-03-16—Filed