FIELD: mining.
SUBSTANCE: claimed process comprises the delineation of mining bord by development working and mining of bord stores by bords with interbord yielding pillars being left. Prior to mining of every board gateway is worked from development working area. Boards are mined ply-by-ply by mining combine from the gateway with drawing of sylvinite to the surface using the halite ply as the filling material at adjacent worked bord. The boards are worked in forward run starting from the mid ply. Then, the bord top ply worked in reverse run. Now, the bord bottom ply is mined in forward run. Combine drum diameter should not exceed 0.5 m where m is the ply minimum depth, m.
EFFECT: higher efficiency of board working.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2585318C1 |
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2584485C1 |
METHOD FOR THICK GENTLY SLOPING POTASSIUM FORMATION DEVELOPMENT | 2004 |
|
RU2272137C1 |
METHOD FOR THICK FLAT-LAYING POTASSIUM SEAM DEVELOPMENT | 2006 |
|
RU2310074C1 |
METHOD FOR EXTRACTION OF MASSIVE SLOPING POTASSIUM BEDS | 2004 |
|
RU2254472C1 |
PROCESSING OF POTASSIC SEAMS | 2013 |
|
RU2524084C1 |
PROCESSING OF POTASSIC SEAMS BY COMBINED TECHNOLOGY | 2013 |
|
RU2524093C1 |
DEVELOPMENT METHOD OF GENTLY SLOPING POTASSIUM BEDS | 2010 |
|
RU2435957C1 |
METHOD OF DEVELOPMENT OF THICK SLOPING POTASSIUM BED WITH ROCK SALT INTERBED | 2009 |
|
RU2421616C1 |
METHOD TO DEVELOP STRONG SLOPING POTASSIUM BED WITH LAYER OF MINE SALT | 2010 |
|
RU2439322C1 |
Authors
Dates
2015-11-10—Published
2014-11-25—Filed