FIELD: mining.
SUBSTANCE: proposed method comprises chamber seal mining, working the chamber entrance from development entry, excavation of rock interlayer and shearer mining of the seam productive seams. Advance cutting of rock interlayer from the seam is performed by blasting. Mining of seam productive layer is performed by shearer mining in radial passes to design width of working chamber. The, the miner is moved to initial position of radial pass. Cut rock interlayer is placed at the soil of worked chamber.
EFFECT: possibility to work potassic small-thickness seams using the miner, ruled out replacement of digging hardware, lower costs of handling jobs.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESSING OF POTASSIC SEAMS BY COMBINED TECHNOLOGY | 2013 |
|
RU2524093C1 |
TREATMENT OF POTASH SEAMS | 2013 |
|
RU2538016C1 |
METHOD TO DEVELOP STRONG SLOPING POTASSIUM BED WITH LAYER OF MINE SALT | 2010 |
|
RU2439322C1 |
DEVELOPMENT OF THICK FLAT-LYING POTASH BEDS | 2014 |
|
RU2567576C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD OF DEVELOPMENT OF THICK SLOPING POTASSIUM BED WITH ROCK SALT INTERBED | 2009 |
|
RU2421616C1 |
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2584485C1 |
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2585318C1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
DEVELOPMENT METHOD OF GENTLY SLOPING POTASSIUM BEDS | 2010 |
|
RU2435957C1 |
Authors
Dates
2014-07-27—Published
2013-06-11—Filed