FIELD: mining.
SUBSTANCE: method includes cutting bed development by chambers by rising sequential cuts by layers and transportation of mineral resource by vehicle. Bed development in chamber is performed by layers along the whole bed thickness, at ascending sequence by short cuts beginning from the bottom layer. Layer cuts are performed at maximum value according to cutting machine executing mechanism. At performing the cuts of rock salt interbed broken-up salt is located after the cutting machine on the chamber ground in a form of a layer, the maximum thickness of which is calculated from expression. Rock salt broken at chamber beginning is located in earlier developed chamber at a distance equal to cutting machine length. Rock salt, located after the cutting machine on developed chamber ground, is smoothed and tramped down with the aid of vehicle. Layer cuts are performed by reciprocating movements of the cutting machine.
EFFECT: invention allows increasing of selective method cost effectiveness, workers labour capacity and decreasing of power consumption connected with rock salt transportation.
4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO DEVELOP STRONG SLOPING POTASSIUM BED WITH LAYER OF MINE SALT | 2010 |
|
RU2439322C1 |
DEVELOPMENT METHOD OF GENTLY SLOPING POTASSIUM BEDS | 2010 |
|
RU2435957C1 |
PROCESSING OF POTASSIC SEAMS BY COMBINED TECHNOLOGY | 2013 |
|
RU2524093C1 |
TREATMENT OF POTASH SEAMS | 2013 |
|
RU2538016C1 |
PROCESSING OF POTASSIC SEAMS | 2013 |
|
RU2524084C1 |
DEVELOPMENT OF THICK FLAT-LYING POTASH BEDS | 2014 |
|
RU2567576C1 |
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2585318C1 |
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2584485C1 |
METHOD FOR THICK GENTLY SLOPING POTASSIUM FORMATION DEVELOPMENT | 2004 |
|
RU2272137C1 |
METHOD FOR DEVELOPMENT OF THICK FLAT COAL SEAM WITH STABLE TOP | 2010 |
|
RU2442895C1 |
Authors
Dates
2011-06-20—Published
2009-12-28—Filed