FIELD: exploding equipment, applicable at demolition of structural objects.
SUBSTANCE: the inner space of building 1(B) or structure (S) is isolated from the exterior by overlapping of through air passages 2 with the aid, for example, of polyethylene film 3 and filling of it with vapor. Then, explosive charges 6 are blasted. At a demolition of a building or structure their structural units wetted from the inside by water condensate practically do not give off any dust from the inside, and the dust formed at demolition of the unwetted parts of the building and structure is suppressed due to additional condensation of water vapor displaced into the atmosphere from the inner space of the building or structure on the dust particles of the secondary cloud. Filling of the gap between the external surface of the building and structure and the sealing shell with vapor makes it possible to accomplish wetting of the external surface of the building and structure by water condensate.
EFFECT: enhanced efficiency of dust suppression at demolition of the building and structure.
2 cl, 1 dwg, 2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DUST SUPPRESSION AT MASS BLASTINGS OF HOLES IN OPEN CUTS | 2000 |
|
RU2168700C1 |
METHOD FOR DESTRUCTION OF BUILDINGS | 2006 |
|
RU2301398C1 |
METHOD FOR BLASTING AND DEVICE FOR ITS REALIZATION | 2003 |
|
RU2252393C1 |
METHOD OF DEMOLITION OF STRUCTURES AND ARRANGEMENT FOR ITS REALIZATION | 1996 |
|
RU2107889C1 |
COMPOSITIONS OF EXPLOSIVE MIXTURES AND METHODS FOR PRODUCTION THEREOF | 2014 |
|
RU2595709C2 |
QUASAR-METHOD FOR DISMANTLING OF BUILDINGS, STRUCTURES AND BUILDING CONSTRUCTIONS | 1998 |
|
RU2151997C1 |
MIXING-CHARGING MACHINE FOR ROBOTIZED TECHNOLOGY OF CREATION OF WELL CHARGES WITH VARIABLE ENERGY SATURATION AND METHODS FOR FORMATION OF DETONATION SYSTEMS BASED ON THEM | 2019 |
|
RU2789093C2 |
GRANULATED OR POWDERY CRYSTALLINE PRODUCT FOR PRODUCTION OF INDUSTRIAL EXPLOSIVE SUBSTANCES | 2006 |
|
RU2354635C2 |
METHOD OF PREPARING INDUSTRIAL EXPLOSIVE | 2004 |
|
RU2262498C1 |
QUASAR-METHOD FOR DISMOUNTING OF BUILDINGS, STRUCTURES AND BUILDING CONSTRUCTIONS | 2000 |
|
RU2190185C2 |
Authors
Dates
2008-02-27—Published
2006-06-09—Filed