FIELD: oil and gas production industry, particularly development of wells having productive reservoir formed of carbonate basin and penetrated along with elongated radial channels creation.
SUBSTANCE: method involves performing interval cleaning of radial channels of water-oil emulsion by implosion method; moving the water-oil emulsion to ground surface; isolating reservoir zone to be treated from overlaying and underlaying well zones with packer; treating reservoir with the use of vibratory pulsator in acid composition medium beginning from lower reservoir zone; forcing acid composition in reservoir with water-free oil after reservoir permeability has been recovered; leaving well as it is for 5-6 hours to provide acid reaction with rock; causing reservoir product inflow by swabbing operation as reservoir zones are isolated one from another.
EFFECT: increased reservoir recovery due to complex well development.
2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTION OF CARBONATE MULTI-BED OIL DEPOSIT OF VOID-CRUMBLING POROSITY | 2004 |
|
RU2285115C2 |
PROCEDURE FOR DEVELOPMENT OF PAYABLE CARBONATE BED | 2010 |
|
RU2423604C1 |
METHOD AND EQUIPMENT TO OPERATE TWO FORMATIONS IN SINGLE WELL | 2004 |
|
RU2296212C2 |
METHOD FOR RECOVERY OF FILTRATION AND CAPACITY PROPERTIES OF OIL-BEARING COLLECTOR HAVING DETERIORATED DURING WELL CONSTRUCTION COMPLETION | 2009 |
|
RU2392423C1 |
DRILLING AGENT | 2007 |
|
RU2362793C2 |
METHOD FOR SECONDARY PRODUCTIVE RESERVOIR EXPOSING IN CASED WELL | 2005 |
|
RU2307922C2 |
METHOD FOR MULTIPAY OIL DEPOSIT DEVELOPMENT | 2004 |
|
RU2299317C2 |
METHOD FOR PROCESSING BOTTOMHOLE ZONE OF FORMATION COMPOSED OF CARBONATE ROCKS WITH OIL RESOURCES COMPLICATED TO EXTRACT | 2005 |
|
RU2288358C2 |
METHOD FOR OBTAINING HARD TO RECOVER OIL RESERVES | 2004 |
|
RU2258133C1 |
METHOD FOR DETERMINATION OF STRATUM PRODUCTIVITY IN PROCESS OF WELL DRILLING | 2012 |
|
RU2486337C1 |
Authors
Dates
2008-03-20—Published
2005-10-19—Filed