FIELD: construction, particularly to reconstruct buildings and building structures.
SUBSTANCE: foundation comprises supports, sheath freely formed in ground inside area defined by foundation so that convexity thereof faces upwards and connected to supports by means of flexible ties. Cement mix layer, metal arch trusses and reinforced concrete layer are serially arranged on ground inside area defined by foundation. Metal sheets are laid on arch trusses and connected with each other through welded joints to create flexible sheath. Pre-stressed flexible ties inserted in through support orifices and provided with fixing anchors are placed over the sheath. In the second embodiment foundation comprises support, sheath freely arranged in ground inside area defined by foundation so that convexity thereof faces upwards and connected to supports by means of flexible ties. Ground mix layer reinforced with cement mix, metal sheets and reinforced concrete layer are serially located on ground inside area defined by foundation. Metal sheets are bent along predetermined profile and connected with each other to create sheath. Relaxed flexible ties inserted in through support orifices and provided with fixing anchors are placed over the sheath.
EFFECT: increased operational reliability.
4 cl, 1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD TO STRENGTHEN FOUNDATION BASES IN SEISMICALLY DANGEROUS AREAS | 2011 |
|
RU2487976C1 |
METHOD FOR MAKING OF IMPERVIOUS SCREEN | 2010 |
|
RU2447228C1 |
METHOD TO PRESS IN PILES AND/OR OTHER BUILDING STRUCTURES AND DEVICE FOR ITS REALISATION | 2013 |
|
RU2534299C1 |
METHOD TO CORRECT IRREGULARITIES OF BUILDINGS AND STRUCTURES SUBSIDENCE ON SLAB FOUNDATION | 2011 |
|
RU2468152C1 |
METHOD FOR STRENGTHENING OF SLOPES AND SLOT MAKER FOR ITS REALISATION | 2008 |
|
RU2371547C1 |
METHOD OF INCREASING BEARING STRENGTH OF PILING | 2007 |
|
RU2379419C2 |
METHOD OF AUGER PILES INSTALLATION | 2015 |
|
RU2575190C1 |
METHOD TO PREVENT UNEVEN SUBSIDENCE OF UNEVENLY LOADED FOUNDATIONS | 2009 |
|
RU2410493C1 |
METHOD FOR FOUNDATION CONSTRUCTION ON HEAVING SOIL IN WINTER PERIOD | 2006 |
|
RU2310724C1 |
BUILDING STRAIGHTENING METHOD | 2004 |
|
RU2275474C2 |
Authors
Dates
2008-03-27—Published
2006-08-01—Filed