FIELD: construction.
SUBSTANCE: method to press in piles and/or other building structures includes installation of an anchoring system with a support and a press-in mechanism, installation of the press-in element under the press-in mechanism and pressing in of the latter. The support of the anchoring system is a bearing pillar of the structure. Two pressed-in elements are installed under the press-in mechanism symmetrically relative to the support. Pressing-in is carried out simultaneously for both elements, besides, in process of pressing in they perform continuous monitoring of their submersion value, and if necessary, the value of their submersion is balanced.
EFFECT: reduced labour intensiveness and simplification of works for manufacturing of equipment and performance of works under restricted conditions with increased load capacity of an existing pile foundation on an existing structure.
4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
METHOD OF CONSTRUCTING PILE FOUNDATION | 0 |
|
SU633986A1 |
METHOD TO REINFORCE EXISTENT BUILDING AND BUILDING STRUCTURE FOUNDATION | 2006 |
|
RU2319809C1 |
METHOD OF CONSTRUCTION PILE FOUNDATION | 0 |
|
SU789649A1 |
METHOD FOR CONSTRUCTION OF PILE FOUNDATION | 2015 |
|
RU2581853C1 |
METHOD AND DEVICE FOR IMPRESSING PILES AND/OR OTHER BUILDING STRUCTURES | 1998 |
|
RU2159829C2 |
METHOD TO CONTROL DISPLACEMENT, SETTING AND HEELING OF STRUCTURE BY PILED FOUNDATIONS, BEING MACROREGULATORS | 2008 |
|
RU2416696C2 |
METHOD OF AUGER PILES INSTALLATION | 2015 |
|
RU2575190C1 |
DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES AND METHOD FOR ERECTING THE DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES | 1993 |
|
RU2068916C1 |
METHOD FOR FORTIFYING FOUNDATION OF BUILDING | 1999 |
|
RU2144111C1 |
Authors
Dates
2014-11-27—Published
2013-05-23—Filed