FIELD: construction, particularly foundation erection in heaving soil at negative temperatures.
SUBSTANCE: method involves creating pit; forming hole in ground; driving foundation body in hole and filling thereof with non-heaving soil. After hole creation heating element is located in designed foundation base area and is linked to power source through temperature regulator.
EFFECT: decreased costs and increased capacity of foundation erection.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROTECTING A STRUCTURE FOUNDATION IN A BUILDING AREA TO MAINTAIN A WET MODE ON HEAVING SOILS | 2019 |
|
RU2707315C1 |
ANTI-HEAVING FOUNDATION OF BUILDING WITH BASEMENT | 2010 |
|
RU2440464C1 |
FOUNDATION | 2002 |
|
RU2206666C1 |
INSPECTION DRAINAGE WELL FOR HEAVING SOILS | 2016 |
|
RU2629780C1 |
HEATED LOW-RISE BUILDING WITH FLOOR BY WARMED PEDIMENTAL CEILING SCAFFOLDING ON HEAVING GROUND BASE | 2006 |
|
RU2337211C2 |
DEVICE FOR PROTECTING THE BASE OF THE FOUNDATION FROM FREEZING | 2022 |
|
RU2781801C1 |
SUPPORT OF CONTACT NETWORK ERECTED ON SWELLING SOILS | 2002 |
|
RU2209269C1 |
METHOD FOR SECURING METAL PILES IN CONDITIONS OF PERMAFROST | 2021 |
|
RU2773488C1 |
SEASONAL FREEZING RETARDING METHOD | 2006 |
|
RU2318098C1 |
CULVERT FOR MOTOR ROAD BUILT ON HEAVING BASE | 2006 |
|
RU2317367C1 |
Authors
Dates
2007-11-20—Published
2006-03-09—Filed