FIELD: oil production with reservoir pressure retention and oil displacement from deposit with water.
SUBSTANCE: method involves using water, which is lifted from producing wells along with oil, for oil displacement; operating oil-producing wells with downhole pumps driven by hydraulic motors, which are activated by water injection from surface, wherein said water is produced from water-bearing reservoirs or from opened water bodies; creating and using separate water-supply low-pressure net; connecting discharge lines of water producing wells and discharge lines of injection wells to the low-pressure net; providing some injection wells with downhole pumps driven by hydraulic drives to provide controllable water injection in reservoir and water removal from reservoir; using said pumps for water taking from water-bearing horizons and for water, oil and gas transportation from oil-producing wells to treatment plant; periodically isolating hole annuity of oil producing wells from oil accumulation net; equipping land-based injection and power pumps, namely pumping stations and locking-and-regulating well devices with remote control system, which controls thereof from central control panel.
EFFECT: improved oil displacement and decreased costs of the method realization, increased efficiency of cyclic reservoir treatment, extended reservoir coverage with displacement processes and reduced produced oil and gas costs.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
BOOSTER PUMP STATION | 2009 |
|
RU2426915C2 |
PUMPING UNIT | 2007 |
|
RU2417330C2 |
OIL-PRODUCING COMPLEX | 2014 |
|
RU2571124C2 |
METHOD OF OIL RECOVERY AT LATE STAGES OF OIL DEPOSIT DEVELOPMENT AND DEVICE ITS EMBODIMENT | 1998 |
|
RU2175377C2 |
METHOD OF INCREASING EFFICIENCY OF OIL PRODUCING WELLS | 2023 |
|
RU2824440C1 |
METHOD OF BITUMINOUS OIL DEPOSIT DEVELOPMENT BY THERMAL METHODS | 2019 |
|
RU2725406C1 |
DEVICE FOR OIL PRODUCTION WITH DOWNHOLE SEPARATION | 2014 |
|
RU2575856C2 |
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS | 2018 |
|
RU2676780C1 |
METHOD OF DEVELOPMENT OF OIL POOL NONUNIFORM REGION | 2000 |
|
RU2186955C2 |
SYSTEM OF HIGHLY WET HOLE STREAM GATHERING AND UTILISATION OF PRODUCED WATER | 2010 |
|
RU2435943C1 |
Authors
Dates
2008-03-27—Published
2005-09-28—Filed