FIELD: agriculture.
SUBSTANCE: for recovery of a rice levee melioration system it is plowed to the plough-layer. Then the levee is flooded by portions to cover the plowed depth, followed by rotatilling of water-saturated soil till complete hydration and forming of thixotropic mass, and air feed into the tillage tool operation zone. Further, during sedimentation, settled water is gradually discharged to a channel. At the last run of rotatillage machine, a microbiological preparation is infused together with air into operation zone of the tool. The preparation is a complex of microorganisms adapted to the conditions propagating destruction and mineralisation of organic complexes produced during hydration of water-saturated plough-layer. For example, an EM-1 Vostok microorganic complex can be used. This technology allows decrease of recovery period, improve leveling quality and eliminate plant residues without the use of pesticide and fertilisers.
EFFECT: faster recovery of a field with melioration system with improved leveling and harmless destruction of plant residues.
2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PLANNING FIELD SURFACE OF RECLAMATION SYSTEM | 0 |
|
SU1544219A1 |
METHOD FOR LEVELLING FIELD SURFACE IN AMELIORATION SYSTEM | 0 |
|
SU1639451A2 |
METHOD OF SOIL RECLAMATION OF RICE IRRIGATION SYSTEM FOR PLANTING RICE | 2011 |
|
RU2482663C2 |
METHOD OF SOIL IMPROVEMENT IN FALLOW OF RICE CROP ROTATION FOR RICE SOWING | 2011 |
|
RU2471339C1 |
METHOD FOR PREPARING SOIL FOR RICE SOWING IN STEAM FIELD OF RICE CROP ROTATION IN SEMI-DESERT ZONE OF KALMYKIA | 2018 |
|
RU2701807C1 |
METHOD OF SOIL PREPARATION TO RICE SOWING IN FALLOW OF RICE CROP ROTATION | 2010 |
|
RU2457650C1 |
METHOD OF INCREASING ANTI-EROSION RESISTANCE OF AGRICULTURAL LANDSCAPE OF CLOSED DEPRESSIONS DURING SNOW MELTING | 2022 |
|
RU2814538C2 |
METHOD FOR RIDGE RICE CULTIVATION ON AGRICULTURAL LANDS OUTSIDE OF RICE IRRIGATION SYSTEMS ON DRIP IRRIGATION UNDER MULCHING FILM | 2021 |
|
RU2780841C1 |
METHOD FOR CULTIVATING RICE WITH UNDERGROUND DRIP WATERING UNDER MULCHING FILM | 2021 |
|
RU2788534C1 |
METHOD FOR PREPARING SOIL FOR RICE SOWING IN STEAM FIELD OF RICE CROP ROTATION | 2018 |
|
RU2714711C1 |
Authors
Dates
2008-07-27—Published
2006-07-19—Filed