FIELD: technological processes.
SUBSTANCE: after preliminary cleaning of defective part of surface of pipe by an abrasive wheel, the edges of the cracks are determined using penetrant flaw detection method and the defective part is then melted by an unsmeltable tungsten electrode. The process of melting starts and ends 10-15 mm from the beginning of the crack and after its end with formation of a depression with fused edges. The obtained depression filled along its whole length by an argonarc method with a filler wire. The surface is then cleaned, flush with the main metal and quality is controlled using ultrasonic flaw detection. Subsequent hardening is carried out using ultrasound pulse processing of the cleaned surface. The method reduces labour intensiveness of the repairing pipes which are in use and with defects in form of stress-corrosion cracks.
EFFECT: increased longevity of gas pipelines.
4 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIRING MAIN PIPELINES | 2004 |
|
RU2277667C1 |
METHOD OF REJECTION AND REPAIR OF UNDERGROUND PIPE LINES | 2016 |
|
RU2639599C2 |
METHOD OF DEFECT CORRECTION OF WELDED SEAM OF A FORMED PIPE SHELL MADE WITH THE USE OF LASER | 2017 |
|
RU2668621C1 |
METHOD OF DEFECT CORRECTION OF WELDED SEAM OF A FORMED PIPE SHELL MADE WITH THE USE OF LASER | 2017 |
|
RU2668623C1 |
METHOD OF PREVENTING PIPELINE WALLS AGAINST CRACKING | 2005 |
|
RU2295088C1 |
METHOD OF REPAIR OF PIPE LINES BY WELDING | 2003 |
|
RU2247890C1 |
METHOD OF RECONDITIONING STAINLESS STEEL BILLETS | 0 |
|
SU1789325A1 |
METHOD FOR PREVENTION OF PIPELINE DESTRUCTION IN ZONES OF MECHANICAL STRESS CONCENTRATION | 2008 |
|
RU2378558C1 |
METHOD OF REPAIRING FRACTURES IN METAL STRUCTURES | 2010 |
|
RU2444425C2 |
PIPELINE UNDERWATER CROSSING REPAIR METHOD | 2018 |
|
RU2693954C1 |
Authors
Dates
2008-11-10—Published
2006-12-25—Filed