FIELD: construction.
SUBSTANCE: construction method of a self-lifting drilling platform containing a pull-out console accommodating subsea wellhead equipment includes manufacturing of a console of sectional longitudinal bearing and boxlike transverse beams with railings. Whereat additional sections of longitudinal bearing beams are manufactured and extended by previously made sections, whereat aggregated length of longitudinal bearing beams is extended by the value adequate to the spacing in the boreholes network. After that longitudinal bearing beams are retracted up to the value sufficient for fastening on them of subsea wellhead equipment placed in the cross plane of the console. Then, previously made boxlike cross beams accommodating railings are set on the longitudinal bearing beams; and their length is increased by means of welded to them at the ends boxlike extensions, whereon additional parts of railings are arranged.
EFFECT: decreased labor intensity of works during construction of self-lifting offshore drilling platform on the bases of the already manufactured one for widening its operational possibilities including that for drilling of greater number of boreholes along with improving storage conditions for subsea wellhead equipment and simplification of its transfer to the wellhead.
3 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
SELF-LIFTING FLOATING DRILLING PLATFORM WITH LOW DRAFT | 2014 |
|
RU2589237C2 |
METHOD FOR BUILDING AND LAUNCHING SELF-LIFTING FLOATING DRILLING PLATFORM | 0 |
|
SU1131759A1 |
SLEETROOF OFFSHORE PLATFORM | 1993 |
|
RU2040638C1 |
IMMERSED MOVABLE CAISSON PROVIDED WITH ICE RESISTANCE FOR SEA OIL WELL DRILLING IN ARCTIC | 1993 |
|
RU2064553C1 |
ICE RESISTANT DRILLING COMPLEX FOR SHALLOW CONTINENTAL SHELF DEVELOPMENT | 2008 |
|
RU2382849C1 |
UNIVERSAL SUBMERSIBLE STRUCTURE ORANGE FOR OIL/GAS WELL DRILLING AND METHOD OF ITS OPERATION | 2012 |
|
RU2515657C1 |
METHOD FOR MOUNTING SEA-BASED ICE-PROOF PLATFORM AND A DEVICE TO IMPLEMENT IT | 1991 |
|
RU2036268C1 |
DEVICE FOR DRILL PIPE AND CASING PIPE STORAGE AND LOADING | 2005 |
|
RU2303120C1 |
METHOD OF FORMING SLEETPROOF COMPLEX FOR DEVELOPMENT OF OIL-GAS DEPOSITS ON ARCTIC SHELF AND SLEETPROOF COMPLEX FORMED BY THE METHOD | 1997 |
|
RU2123088C1 |
METHOD TO DEVELOP FLOATING SEMISUBMERSIBLE DRILLING SHIP AND ITS DESIGN | 2013 |
|
RU2524700C1 |
Authors
Dates
2008-12-27—Published
2007-03-27—Filed