FIELD: construction.
SUBSTANCE: invention relates to underground construction and, particularly, to concrete works for large diameter transport tunnels construction. The engineering task is solved by supporting and longitudinal walls concreting along the tunnel length by means of blocks installed at intervals. Length of intervals is equal to block length. Further concreting of intervals is performed concurrently with the cementing of roadway slab section above the previously cemented blocks of walls.
EFFECT: increase of structural elements concreting rate.
2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
TUNNEL INTERIOR ARRANGEMENT METHOD AND DEVICE USED FOR REALISATION THEREOF | 2007 |
|
RU2355848C1 |
METHOD AND DEVICE FOR ROADWAY PANEL CONSTRUCTION IN TUNNEL HAVING AT LEAST TWO SPANS UNDER THE PANEL | 2005 |
|
RU2269004C1 |
CONSTRUCTION METHOD OF UNDERGROUND TUNNEL PAVING | 2003 |
|
RU2229000C1 |
TUNNEL INTERIOR ARRANGEMENT METHOD | 2007 |
|
RU2355847C1 |
METHOD FOR CONSTRUCTION OF TUNNEL INTERNAL STRUCTURES, COMPLEX FOR CONSTRUCTION OF TUNNEL INTERNAL STRUCTURES AND MOVABLE SCAFFOLDS | 2022 |
|
RU2801520C1 |
HOUSE-BUILDING COMBINE | 1995 |
|
RU2087650C1 |
PROCESS OF ERECTION OF UNDERGROUND STRUCTURE | 2001 |
|
RU2198263C1 |
SECTIONATED TRAVELLING FORM | 0 |
|
SU945452A1 |
DEVICE FOR ERECTION OF BUILDING FROM MONOLITHIC REINFORCED CONCRETE | 0 |
|
SU1698400A1 |
METHOD FOR ERECTION OF BRIDGE ON WATER AREA | 2011 |
|
RU2483153C2 |
Authors
Dates
2009-01-20—Published
2006-09-11—Filed