FIELD: construction industry.
SUBSTANCE: invention refers to methods and equipment used when arranging transport tunnel with two or three spans under road slab. Method involves delivery and erection of reinforcement cages, removal, relocation and installation of sectional forms, as well as concreting of span abutments with subsequent placing thereon of road slab panels prefabricated and delivered to the place of laying, and provides sufficient improvement of slab erection rate owing to enlarging the scope of performed works.
EFFECT: improving slab erection rate, and reducing labour input of works carried out in the tunnel.
Title | Year | Author | Number |
---|---|---|---|
TUNNEL INTERIOR ARRANGEMENT METHOD AND DEVICE USED FOR REALISATION THEREOF | 2007 |
|
RU2355848C1 |
METHOD AND DEVICE FOR ROADWAY PANEL CONSTRUCTION IN TUNNEL HAVING AT LEAST TWO SPANS UNDER THE PANEL | 2005 |
|
RU2269004C1 |
METHOD OF CONCRETE WORKS PERFOMANCE FOR ROADWAY SLAB INSTALLATION IN TUNNELS AND RELATED EQUIPMENT | 2006 |
|
RU2344234C2 |
UNDERGROUND STRUCTURE CONSTRUCTED IN FOUNDATION PIT AND METHOD OF CONCRETING | 1997 |
|
RU2131496C1 |
MOVABLE CONCRETE FORM FOR CONCRETING FLOORS | 1994 |
|
RU2061181C1 |
METHOD FOR BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN FOUNDATION PITS AND BURIED STRUCTURE FOR MILITARY INFRASTRUCTURE FACILITIES | 2018 |
|
RU2702779C1 |
CONSTRUCTION METHOD OF UNDERGROUND TUNNEL PAVING | 2003 |
|
RU2229000C1 |
PROCESS OF ERECTION OF UNDERGROUND STRUCTURE | 2001 |
|
RU2198263C1 |
CONSTRUCTION METHOD | 2019 |
|
RU2706288C1 |
METHOD OF CULVERT CONSTRUCTION (VERSIONS) | 2016 |
|
RU2632725C2 |
Authors
Dates
2009-05-20—Published
2007-11-28—Filed