FIELD: metallurgy.
SUBSTANCE: from interim ladle steel is fed into composite mold and poured with speed 0.45-0.60 m/min. Steel temperature in interim ladle is higher than the liquidus temperature for 5-35°C. Crystalliser contains cooling plates with vertical ribs in area of plates joint. Cathetus a and b, forming ribs are in ratio a/b=1:(1.0-1.3). Ratio of small cathetus a to small side h of crystalliser is 1:(15-20), ratio of big cathetus b to big side l of crystallizer is 1:(18-24), and ratio of small side h to big side l of crystalliser is 1:1.2. Total area of crystalliser is 1075-1080 cm2. Dimensions of crystalliser, located in limits of declared ratios, allows reduction of surface defect of uninterruptedly-casted blanks.
EFFECT: steadfastness increasing of crystalliser and increasing of continuous caster productivity, improving of macrostructure of casted uninterruptedly-casted blanks.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPOSITE MOLD FOR CONTINUOUS CASTING OF BLANKS | 2007 |
|
RU2348480C2 |
RAIL STEEL CASTING METHOD IN MACHINE FOR BILLET CONTINUOUS CASTING | 2004 |
|
RU2264885C1 |
BUILT UP MOLD FOR CONTINUOUS CASTING OF BILLETS | 2003 |
|
RU2234390C1 |
METHOD OF INGOT CONTINUOUS CASTING | 2007 |
|
RU2345862C1 |
METHOD OF PRODUCING CONTINUOUSLY-CAST STEEL BILLETS | 2010 |
|
RU2444413C1 |
PROCEDURE FOR PRODUCTION OF CONTINUOUS CAST WORK PIECE OF UPGRADED QUALITY | 2009 |
|
RU2407606C1 |
METHOD OF PRODUCING CONTINUOUSLY-CAST STEEL BILLETS | 2012 |
|
RU2494834C1 |
METHOD OF CONTINUOUS STEEL CASTING | 2009 |
|
RU2403121C1 |
METHOD OF STEEL CONTINUOUS CASTING | 2012 |
|
RU2492021C1 |
METHOD OF POURING OF RAILS STEEL AT INSTALLATION FOR CONTINUOUS CASTING WITH CURVILINEAR TECHNOLOGICAL AXIS | 2008 |
|
RU2384385C2 |
Authors
Dates
2009-03-10—Published
2007-04-11—Filed