FIELD: construction.
SUBSTANCE: dam includes body erected from fine-grained material and transition layer made of consertal material and arranged in coastal abutments. Transition layer made of consertal material is arranged with addition of clay soil in amount that provides for the following content of pit-run fines in prepared soil mixture, and pit-run fines means fractions with conventional diameter of less than 5 mm, at least 40% and dust-clay fractions - at least 15% at continuous granulometry and 35% at discontinuous granulometry.
EFFECT: increased suffosion strength and filtration isotropy due to increased strength of transition layer.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
0 |
|
SU388087A1 | |
COMPOSITE-TYPE ROCKFILL DAM | 2017 |
|
RU2642643C1 |
GROUND MATERIAL DAM | 0 |
|
SU1618821A1 |
EARTH DAM | 2007 |
|
RU2346107C2 |
METHOD OF MONITORING COMPACTION PERFORMANCE OF INHOMOGENEOUS CLAYEY EARTH | 1991 |
|
RU2010083C1 |
METHOD FOR ELIMINATING LEAKS AND INCREASED FILTRATION OF SOIL HYDRAULIC STRUCTURES | 2020 |
|
RU2754380C1 |
0 |
|
SU1784710A1 | |
ERECTION METHOD OF EARTHWORK STRUCTURE FROM CLAY SOIL | 2014 |
|
RU2561635C1 |
EARTH DAM WITH LOCK | 2021 |
|
RU2772874C1 |
DEVICE FOR DETERMINING FILTRATION COMPONENTS IN COMPACTED EARTH EMBANKMENTS | 0 |
|
SU1724786A1 |
Authors
Dates
2009-04-20—Published
2007-10-03—Filed