FIELD: communication facilities.
SUBSTANCE: method concerns electric and radio communication, particularly method of frequency scheduling in mobile land communication systems. To achieve the effect method involves spatial separation of GSM 900 standard frequency bands by frequency bands of DCS 1800. If frequency resource is not sufficient in GSM 900 standard, operator designs focused areas of DCS 1800 standard including one or more base DCS 1800 stations. Focused area of DCS 1800 standard is introduced to separate GSM 900 standard areas in space and increase additional protection interval between cells with recurrent frequencies, and to relieve additional client load, thus resulting in increased possibilities for frequency recursion in both standards.
EFFECT: expanded coverage area of mobile land communication systems, improved quality of services provided to clients of electric and radio communication networks, improved parametres of electromagnetic compatibility.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROVIDING ELECTROMAGNETIC COMPATIBILITY OF RADIOELECTRONIC EQUIPMENT OF SHORT-RANGE RADIOTECHNICAL NAVIGATION SYSTEM AND MOBILE RADIO COMMUNICATION SYSTEM | 2010 |
|
RU2433540C2 |
METHOD FOR DATA TRANSMISSION VIA CELLULAR COMMUNICATION SYSTEM AND SYSTEM FOR ITS IMPLEMENTATION | 2009 |
|
RU2454043C2 |
METHOD OF FREQUENCY PLANNING IN MOBILE COMMUNICATION SYSTEMS | 2007 |
|
RU2375819C2 |
RADIO COMMUNICATIONS METHOD | 2004 |
|
RU2251809C1 |
METHOD FOR PLANNING JOINT OPERATION OF LTE AND GSM CELLULAR COMMUNICATION NETWORKS | 2023 |
|
RU2814537C1 |
CELLULAR RADIO COMMUNICATION SYSTEM | 2004 |
|
RU2269204C1 |
METHOD OF ASSURING COMMUNICATIONS ELECTROMAGNETIC COMPATIBILITY | 2007 |
|
RU2345483C1 |
METHOD TO ASSIGN FREQUENCY CHANNELS IN CELLULAR NETWORK | 2010 |
|
RU2472311C2 |
RADIO COMMUNICATIONS PROCESS | 2002 |
|
RU2223602C1 |
MOBILE RADIO COMMUNICATION METHOD | 2010 |
|
RU2474052C2 |
Authors
Dates
2009-08-10—Published
2007-08-03—Filed