FIELD: construction.
SUBSTANCE: invention is related to construction, namely to methods for dismantling of foundations by explosion energy in tight conditions. Method for dismantling of foundations by explosion energy in tight conditions consists in the fact that boreholes are drilled in base of foundation, they are charged with necessary mass of explosion energy, free space is filled by tamping, and heavy metal shelter is installed above dismantled foundation. Installation of shelter is carried out with creation of tight air gap, ratio of which to shelter weight amounts to 1-10 m3/t. Opposite borehole charges, tanks are installed, which are filled water or aqueous solution of inhibitors of gas-air or dust-air medium ignition, which prevent inflammation of explosive medium with simultaneous degassing of toxic products of explosion.
EFFECT: provision of possibility to perform dismantling of foundations in close proximity from existing production facilities with complete observation of safety engineering and sanitary norms at gas-dangerous enterprises, acceleration and cheapening of blast works, improved quality of dismantling of foundations of any size at full elimination of actions from damaging factors of explosion.
2 cl, 1 ex, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ELIMINATE HEEL OF SUPPORTS IN RESTRICTED AREAS | 2009 |
|
RU2431019C2 |
METHOD TO CRUSH STEEL AND SLAG/CAST-IRON SCRAPS | 1992 |
|
RU2031724C1 |
COMPOSITION OF BOTTOM-MOUTH STEMMING | 1996 |
|
RU2091581C1 |
METHOD OF BLAST SEPARATION OF CONCRETE AND REINFORCED - CONCRETE BUILDING STRUCTURES AT THEIR DISMANTLING | 1994 |
|
RU2084815C1 |
METHOD FOR DETERMINING KNOCK ATTENUATION | 2020 |
|
RU2748830C1 |
STEM | 2020 |
|
RU2736017C1 |
METHOD OF DRILLING AND BLASTING OPERATIONS IN ROCK WORKINGS | 1997 |
|
RU2115088C1 |
METHOD FOR OBTAINING A PRESET CRUSHING RATIO OF FISSURED MOUNTAIN MASS AND THE REQUIRED COEFFICIENT OF HEADING ADVANCE PER ROUND TO SHOT HOLES LENGTH RATIO | 2010 |
|
RU2442957C2 |
METHOD FOR DEMOLITION OF BUILDINGS AND STRUCTURES IN RESTRICTED CONDITIONS WITH COVERAGE | 2008 |
|
RU2379624C1 |
CHARGE | 2013 |
|
RU2524829C2 |
Authors
Dates
2009-09-10—Published
2008-04-08—Filed