FIELD: oil and gas production.
SUBSTANCE: invention refers to oil industry and can be implemented at survey of wells. The method of evaluation of static and dynamic levels of fluid in annular space of a well equipped with an electric centrifugal pump includes evaluating of levels by geo-physic methods. Prior to evaluation of levels a hole is made in a face plate. A perforated plastic pipe narrowed in its lower part and secured on external surface of a flow string is lowered together with the flow string and the pump into the well. Bottom of the plastic pipe is arranged 0.5-1.0 m above the pump; an upper end of the plastic pipe comes out to surface through the hole in the face plate. A gap between the plastic pipe and the hole of the face plate is leak proofed; a measuring tape with a level sensor is lowered inside the plastic pipe. Surface of fluid is contacted; a level is measured and the measuring tape is withdrawn out of the plastic pipe.
EFFECT: simplification of measuring procedure of fluid level.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION | 2014 |
|
RU2562641C2 |
METHOD FOR LOWERING OF LOGGING TOOL INTO WELL AND DEVICE FOR ITS REALIZATION | 1991 |
|
RU2029079C1 |
WELL DEVELOPMENT AND OPERATION METHOD AND CONFIGURATION OF DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION | 2014 |
|
RU2559999C2 |
OPERATING METHOD OF WELLS, AND ARRANGEMENT OF DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION | 2014 |
|
RU2563268C2 |
METHOD OF DETERMINING AIR-TIGHTNESS OF DOWNHOLE EQUIPMENT WITH DUAL EXTRACTION OF FLUIDS FROM WELL WITH SUCKER-ROD AND ELECTRIC-CENTRIFUGAL PUMP | 2015 |
|
RU2589016C1 |
METHOD FOR OPERATING A PAIR OF WELLS FOR PRODUCING HIGH-VISCOSITY OIL | 2019 |
|
RU2744609C1 |
EQUIPMENT FOR DUAL BED OPERATION FOR OIL- AND GAS-BEARING FORMATIONS IN WELL | 2014 |
|
RU2572041C2 |
METHOD FOR STUDYING DIRECTIVE AND HORIZONTAL WELLS DURING PUMPING OPERATION | 2023 |
|
RU2810764C1 |
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT | 2017 |
|
RU2678745C1 |
WELL JET PLANT FOR SELECTIVE TESTING OF FORMATIONS | 2016 |
|
RU2631580C1 |
Authors
Dates
2009-10-10—Published
2008-10-24—Filed