FIELD: marine equipment.
SUBSTANCE: proposed device comprises frame, load bearing net and gripping element. Note that the latter can grip the net and underwater equipment to be reboarded. Reboarding underwater equipment is made by lowering frame-supported net onto equipment till gripping element grips the net. Frame and net are pulled out onto water surface with equipment. Reboarding process can comprises search of the equipment by monitoring the load acting on frame and net during lowering and upping them. Aforesaid gripping element can have its end made in the form of spear-like head, hook or tooth.
EFFECT: simplified reboarding of underwater equipment.
17 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
VERTICAL INSTALLATION OF ELONGATED TECHNOLOGICAL ASSEMBLY | 2004 |
|
RU2353755C2 |
METHODS OF LOWERING AND LIFTING FOR SUBMERSIBLE VEHICLES AND OTHER PAYLOADS | 2012 |
|
RU2623293C2 |
MOORING SYSTEM WITH SEPARATED ANCHOR LINES AND/OR MARINE RISER SYSTEM | 2010 |
|
RU2519456C2 |
COMPLEX FOR LOWERING AND LIFTING OF EQUIPMENT FOR EXTRACTION OF MINERALS FROM SEA BOTTOM | 2023 |
|
RU2814109C1 |
METHOD OF LIFTING SUNKEN OBJECT AND DEVICE TO THIS END | 2005 |
|
RU2359861C2 |
METHOD FOR RAISING SHIPS AND SUBMARINES FROM BOTTOM | 2023 |
|
RU2821376C1 |
DELIVERY AND RECOVERY DEVICE, METHOD AND APPLICATION | 2013 |
|
RU2628418C2 |
SYSTEM AND METHOD OF CORE BORING WITH DETACHABLE CORE BARREL | 2009 |
|
RU2493348C2 |
ICE-BREAKER (VERSIONS), METHOD AND SYSTEM FOR SINGLE-SUPPORT MOORING AND SERVICING OF SHIPS | 2002 |
|
RU2201375C1 |
SYSTEM AND METHOD OF MOUNTING HYDROELECTRIC TURBINE | 2008 |
|
RU2459110C2 |
Authors
Dates
2009-12-10—Published
2006-12-21—Filed