FIELD: construction.
SUBSTANCE: construction method of pile-slab foundation of high-rise building includes excavation of pits and piling field with subsequent concreting of foundation slab. Piling field is constructed over the entire area of the pit made of bored or driven piles of the same length, after that the jacks are installed on each pile of the central zone of pit and load of value equal to 0.8-1.0 of the estimated load is applied by turn on pile, followed by removal of load after conditional stabilisation of the pile settlement to equalise the stiffness coefficient between the piles of the central and peripheral zones of foundation slab.
EFFECT: increase of the load-carrying ability of the foundation under the high-rise building, reduction of labour coefficient of its construction and materials consumption.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION METHOD OF PILE-SLAB FOUNDATION OF HIGH-RISE BUILDING | 2013 |
|
RU2549633C1 |
METHODS OF CONSTRUCTION OF PILE-SLAB FOUNDATION | 2013 |
|
RU2549635C1 |
SINGLE-PILE-SLABBY FOUNDATION | 2016 |
|
RU2638664C2 |
METHOD OF CONSTRUCTING HIGH-RISE STRUCTURE PILE-AND-SLAB FOUNDATIONS | 2007 |
|
RU2345195C2 |
METHOD OF CONTROLLING ROLLS OF PILE-RAFT FOUNDATION IN SEISMIC REGIONS ON NON-UNIFORMLY COMPRESSIBLE SOILS | 2020 |
|
RU2734750C1 |
DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES AND METHOD FOR ERECTING THE DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES | 1993 |
|
RU2068916C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2008 |
|
RU2378454C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD FOR PLATE-PILE FOUNDATION CONSTRUCTION | 2016 |
|
RU2616633C1 |
METHOD OF ERECTING HIGH-RISE BUILDING ON NATURAL BASE | 2016 |
|
RU2634762C1 |
Authors
Dates
2015-04-27—Published
2013-12-26—Filed