FIELD: construction.
SUBSTANCE: method for slab installation includes erection of support columns onto previously prepared foundations. Parallel ropes are stretched between columns along external contour below slab level. Sheet flooring is fixed on ropes. Flooring is used to mount sagging rods of lower slab plate and rods of upper slab plate with upward curve. Braces are attached between rods of upper and lower plates. Support contour is reinforced and concreted. Ropes are tensioned, and flooring is fixed to them bias between columns. Diagonal slab reinforcement is mounted. Concentric reinforcement is suspended with arrangement of solid suspended flooring. Brace grid is installed into middle strip of slab. Upper slab plate is reinforced and concreted. Lower slab plate is reinforced and concreted. Columns are concreted, and ropes with flooring are dismantled.
EFFECT: possibility to install slab in areas, where it is impossible or difficult to work on platform under slab.
5 cl
Title | Year | Author | Number |
---|---|---|---|
HUNG CEILING | 2008 |
|
RU2400606C2 |
SUSPENDED COVERING AND METHOD OF ITS ERECTION | 1996 |
|
RU2104375C1 |
METHOD FOR PILE ENLARGEMENT PRODUCTION | 2003 |
|
RU2239024C1 |
CONSTRUCTION METHOD | 2019 |
|
RU2706288C1 |
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA | 2023 |
|
RU2809049C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METHOD FOR ERECTION OF MONOLITHIC MULTI-SPAN OVERLAPPING | 2019 |
|
RU2710229C1 |
METHOD FOR ERECTION OF VAULT-TYPE STRUCTURE OF BUILDING | 1996 |
|
RU2112847C1 |
METHOD OF MONOLITHIC BUILDING ERECTION AND MOVABLE FRAMEWORK FOR ITS REALIZATION | 1993 |
|
RU2078884C1 |
METHOD FOR MANUFACTURING A GRAVITY-TYPE BASE (GTB) AT A SPECIALIZED PRODUCTION SITE | 2022 |
|
RU2771197C1 |
Authors
Dates
2010-01-20—Published
2008-09-30—Filed