FIELD: railway equipment.
SUBSTANCE: method to assemble point switches, mainly, with reinforced concrete bars, comprises steps effected at stationary benches including tracks for actuating mechanisms transfer, i.e. arrangement of bars in compliance with diagram and long cord, placing gaskets and washers thereon, placing rails, inserted and terminal bolts and screwing nuts thereon. Jobs are specially grouped and performed simultaneously at all stationary benches. At least four benches are arranged in pairs on parallel tracks. Actuating mechanisms, after travel along a pair of benches of one track, are transferred onto parallel track directed towards benches of parallel track.
EFFECT: faster production of assembled point switches.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ASSEMBLE SWITCH THROWS | 2009 |
|
RU2424392C1 |
PRODUCTION ASSEMBLY LINE OF TRACK SWITCHES | 2008 |
|
RU2385373C1 |
METHOD FOR FLOW ASSEMBLY OF POINT SWITCHES | 2008 |
|
RU2374377C2 |
MOBILE UNIT FOR REINFORCED CONCRETE BEAMS INSTALLATION IN POINT OPERATING GEAR AGAINST DIAGRAM AND ORDINATES | 2007 |
|
RU2355843C1 |
LINE FOR REPAIR OF RAILWAY TRACK LENGTHS WITH REINFORCED CONCRETE TIES | 2007 |
|
RU2361032C1 |
FLOW LINE FOR ASSEMBLY OF RAIL TRACK SWITCH | 2010 |
|
RU2451125C1 |
FLOW LINE FOR ASSEMBLY OF POINT SWITCHES OF RAILWAY TRACK | 2008 |
|
RU2373319C1 |
RAILWAY SLIP SWITCH ASSEMBLY BELT LINE | 2009 |
|
RU2400590C1 |
FLOW LINE FOR ASSEMBLY OF RAIL TRACK SWITCH | 2010 |
|
RU2451124C1 |
BENCH FOR ASSEMBLING SWITCH POINTS | 0 |
|
SU1093740A1 |
Authors
Dates
2010-02-20—Published
2008-10-09—Filed