FIELD: construction.
SUBSTANCE: invention relates to geotechnical construction, namely to method of reinforcement of foundations. Method of raft foundations reinforcement comprises arrangement of through hole in foundation with exposure of its top and bottom bars, immersion of tube with thread to form reinforcement pile and screwing on plate on it. To plate preliminary welded longitudinal and transverse reinforcement rods and connected to lower rods of foundation.
EFFECT: technical result consists in improvement of reliability of interfacing an inclined pile with existing foundation (reinforced concrete grill or reinforced concrete plate of base) at reconstruction of buildings and foundations, providing for production of interfacing unit, ensuring inclusion of pile into joint operation of foundation.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
METHOD FOR PLATE-PILE FOUNDATION CONSTRUCTION | 2016 |
|
RU2616633C1 |
METHOD FOR PILE-AND-MAT FOUNDATION ERECTION | 2006 |
|
RU2321703C1 |
METHOD OF REINFORCEMENT OF FOUNDATIONS | 2008 |
|
RU2360071C1 |
DEVICE FOR MAKING DRILLED INJECTION CONICAL PILES FOR CLAY SOILS | 2023 |
|
RU2813864C1 |
METHOD OF ARRANGING INJECTION PILE | 2016 |
|
RU2637002C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METHOD OF INJECTION PILE BUILDING | 2003 |
|
RU2238366C1 |
PREFABRICATED BLOCK OF FERROCONCRETE MAT OF PILE FOUNDATION AND METHOD OF CONSTRUCTING PILE FOUNDATION WITH FERROCONCRETE MAT OF PREFABRICATED BLOCKS | 0 |
|
SU1135852A1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
Authors
Dates
2016-07-20—Published
2015-07-13—Filed