FIELD: metallurgy.
SUBSTANCE: method of calibration of weighing system of upper bin of blast furnace consists in implementation of at least one linear hydraulic drive containing corrugated compensator axially connected between first and second end plates and limiting chamber of hydraulic pressure and facility for supply of hydraulic fluid into said chamber of hydraulic pressure; further method consists in determining value of force for establishing calibration data for weighing system. Also here is disclosed the method of weighing material in the upper bin of the blast furnace including the calibrating method and using calibrating data for calculation of weight by formula of type W=f (L; P), where W is actual weight of charged material; L is load measured by means of the facility for weight measuring; P is pressure exerted on the bin.
EFFECT: improvement of method and facility for calibration of weighing system of upper bin of blast furnace.
17 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCTION OF MINERAL WOOL THERMAL INSULATION MATERIALS BASED ON BASALT ROCKS AND RESULTING MINERAL WOOL INSULATION BASED ON ENVIRONMENTALLY FRIENDLY BASALT ROCKS | 2022 |
|
RU2804530C1 |
METERING DEVICE FOR FLUENT MATERIALS | 0 |
|
SU645621A3 |
METHOD AND APPARATUS FOR CHARGING SHAFT FURNACE | 0 |
|
SU1007558A3 |
METHOD AND APPARATUS FOR WEIGHING | 0 |
|
SU1606870A1 |
METHOD AND APPARATUS FOR COMPACTING COAL FOR COAL COKING PROCESS | 2007 |
|
RU2411282C2 |
PLANT FOR LOADING CHARGE MATERIALS IN INDUCTION FURNACE FOR MELTING FERROUS AND NONFERROUS METALS | 2013 |
|
RU2526360C1 |
PRODUCTS DISTRIBUTOR, SYSTEM AND METHOD OF METER AUTOMATIC CALIBRATION | 2011 |
|
RU2567762C2 |
APPARATUS FOR CHARGING SHAFT FURNACE | 1997 |
|
RU2118372C1 |
SHAFT FURNACE CHARGING DEVICE WITH ROTARY TROUGH | 1995 |
|
RU2127318C1 |
CORRUGATED COMPENSATOR | 2016 |
|
RU2695849C1 |
Authors
Dates
2010-03-27—Published
2005-10-18—Filed