FIELD: construction.
SUBSTANCE: scaffolding includes support-adjustment accessories in the form of jack screws and support structure that bears casing bottom and consists of longitudinal and transverse beams. Jack screws in span and at the ends of bridge span are fixed on side walls and diaphragms of the main beams with the help of T-shaped cantilever tables equipped with vertical tubular elements, where screws of jacks are freely installed, having spherical head in upper part with a cup freely placed on it and having a location plate with a reverse spherical surface. On upper plane of cup there are transverse beams of support structure installed, which are fixed on it with the help of side limiters in the form of pins and L-shaped stops, and at the end of vertical tubular elements of T-shaped cantilever tables there are flanges arranged, on which jack screw nut rests.
EFFECT: expansion of technological resources of scaffolding.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
MOBILE STAGING | 2007 |
|
RU2342483C1 |
PROJECTING SCAFFOLD AND METHOD FOR SCAFFOLD OR REINFORCED CONCRETE BRIDGE SPAN STRUCTURE COPING BLOCK ERECTION | 2006 |
|
RU2310033C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
PROCESS WIDENING BRIDGE STRUCTURE | 2001 |
|
RU2205914C1 |
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION | 2004 |
|
RU2242559C1 |
SCAFFOLD FOR BRIDGE SPAN STRUCTURE MOUNTING | 2004 |
|
RU2275455C2 |
METHOD FOR REINFORCED CONCRETE BRIDGE CONSTRUCTION | 2004 |
|
RU2283911C2 |
BRIDGE SPAN STRUCTURE ERECTION METHOD | 2005 |
|
RU2280121C1 |
MONOLITHIC SOLID PRESTRESSED PLATE-AND-RIB BRIDGE SPAN STRUCTURE | 2004 |
|
RU2249068C1 |
STEEL/REINFORCED CONCRETE SPAN | 1992 |
|
RU2040629C1 |
Authors
Dates
2010-04-10—Published
2008-05-29—Filed