FIELD: construction.
SUBSTANCE: method for reduction of drilling rig torsion torques at stages of preliminary well expansion in process of well preparation for pipeline dragging in it includes drilling pilot well and its expansion prior to pipeline dragging. At the same time expansion is carried out in stages by means of expanders pulling-through, and well cross section is shaped close to ellipse, with arrangement of its largest diametre in vertical plane, area of cut soil is reduced in single passing of expander in well by repeated pulling of expander in well without increasing expander diametre.
EFFECT: reduced energy intensity of process with reduction of torsion torque.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PIPELINE PULLING THROUGH HORIZONTAL HOLE UNDER WATER AND OTHER NATURAL AND ARTIFICIAL OBSTACLES | 2005 |
|
RU2313636C2 |
BUILT-UP STRUCTURE FOR PULLING THROUGH PIPELINES IN WELLS MADE BY METHOD OF HORIZONTAL DRILLING IN UNSTABLE EARTH | 2009 |
|
RU2428544C2 |
WELL HOLE REAMER | 2005 |
|
RU2338035C2 |
METHOD TO CONTROL BALLASTING OF PIPELINE PULLED IN HORIZONTAL WELL UNDER WATER AND OTHER NATURAL OBSTACLES BY HORIZONTAL DRILLING PLANT | 2008 |
|
RU2384673C2 |
METHOD FOR PIPELINE DRAWING THROUGH HORIZONTAL WELL UNDER WATER AND OTHER NATURAL OBSTACLES | 2005 |
|
RU2323304C2 |
WELL BORE REAMER | 2005 |
|
RU2303108C2 |
PIPELINE PULLING METHOD IN HORIZONTAL WELL | 2019 |
|
RU2734198C1 |
DEVICE FOR DIRECTIONAL EXPANSION OF A PILOT WELL | 2022 |
|
RU2778870C1 |
METHOD OF PIPE LAYING UNDER WATER OBSTACLES | 2007 |
|
RU2342585C2 |
COMMUNICATIONAL WELL DRILLING METHOD | 2005 |
|
RU2299967C1 |
Authors
Dates
2010-09-20—Published
2008-06-16—Filed