FIELD: construction.
SUBSTANCE: metal reservoir includes wall and bottom connected to each other with the help of compensation element. Compensation element is arranged in the form of circular parabola-shaped element arranged strictly vertically between wall of reservoir and circular stiffening rib fixed tightly in circular direction at reservoir bottom and having working height h, which is three times more than diametre d of circular parabola-shaped element. Circular parabola-shaped element by its upper ends is also absolutely tightly fixed in circular direction accordingly on stiffening rib and vertical wall of reservoir.
EFFECT: elimination of any potential possibility of additional stress development in reservoir wall from rigid jamming, and possibility of temperature actions and uneven deformations of soil foundation.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
LARGE RESERVOIR FOR OIL PRODUCT STORAGE | 2004 |
|
RU2270904C1 |
VERTICAL CYLINDRICAL STEEL TANK FOR OIL AND OIL PRODUCTS STORAGE | 2018 |
|
RU2695181C1 |
METHOD FOR REPAIRING BASIS OF STEEL RESERVOIRS AND VIBRATING SCREED FOR ITS IMPLEMENTATION | 2016 |
|
RU2626504C1 |
METHOD FOR REPAIR OF BASE OF VERTICAL METAL TANKS FOR OIL PRODUCTS AND OIL | 2021 |
|
RU2756591C1 |
OIL PRODUCT STORAGE TANK | 2008 |
|
RU2367745C1 |
METAL OIL STORAGE TANK | 2002 |
|
RU2228416C2 |
RESERVOIR CONSTRUCTION METHOD | 2004 |
|
RU2264504C1 |
STEEL TANK FLOATING ROOF | 2006 |
|
RU2306247C1 |
STORAGE FOR ECOLOGICALLY DANGEROUS MATERIALS IN SEISMIC COUNTRIES | 1999 |
|
RU2149470C1 |
RESERVOIR FOR OIL PRODUCTS | 1992 |
|
RU2068804C1 |
Authors
Dates
2010-09-27—Published
2009-04-21—Filed