FIELD: mining.
SUBSTANCE: method for formation and opencast of temporary idle open pit wall, including creation of temporary idle open pit wall section in zone of mining works with platforms at the ends of pillar with width identified on the basis of mining equipment arrangement, required distance for location of exploded rock mass and volume of rock that must be left in pillar. At the same time opencast of temporary idle wall is done at the ends, through recovery of mining works at the side of platforms to centre of pillar, starting from upper horizon or simultaneously along full height of pillar.
EFFECT: reduced scope of works required for preparation of temporary idle wall for opencast.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMING AND DEPRESERVING STEEP TEMPORARY NONACTIVE WALLS WHEN DEVELOPING DEEP LAYING DEPOSITS | 2016 |
|
RU2632604C1 |
METHOD FOR DEPRESERVATION STEEPLY INCLINED NONACTIVE SIDEWALLS | 2016 |
|
RU2632606C1 |
METHOD OF OPEN WORKING OUT OF STEEP DEPOSITS OF PLATFORM SHAPE | 2013 |
|
RU2528704C1 |
METHOD FOR OPEN DEVELOPMENT OF STEEP DEPOSITS WITH APPLICATION OF MULTISTAGE TEMPORARILY NON-WORKING SIDES | 2018 |
|
RU2685583C1 |
METHOD FOR OPEN DEVELOPMENT OF DEEP-LYING ROUNDED DEPOSITS | 2019 |
|
RU2738148C1 |
METHOD OF OPEN MINING OF STEEPLY PITCHING FIELDS OF AREAL FORM USING HYDRAULIC BACKHOE EXCAVATORS | 2015 |
|
RU2574749C1 |
METHOD FOR REACTIVATION OF PIT EDGE | 2003 |
|
RU2239065C1 |
METHOD OF OPEN DEVELOPMENT OF STEEP DEPOSITS OF AREA FORM | 2013 |
|
RU2533996C1 |
METHOD FOR OPEN DEVELOPMENT OF STEEPLY-DIPPING DEPOSITS WITH APPLICATION OF COMBINED TEMPORARY NON-WORKING SIDES | 2018 |
|
RU2685587C1 |
METHOD OF OPEN MINING OF STEEP DIPPING FIELD HAVING ROUND FORM USING TEMPORARY NONWORKING SIDEWALLS | 2015 |
|
RU2612178C2 |
Authors
Dates
2010-09-27—Published
2009-06-29—Filed