FIELD: construction.
SUBSTANCE: invention may be used in construction and reconstruction of railway technical systems "earth bed - permanent way" (TS), highways, basements of structures and foundations, supports of manmade structures, power transmission lines and a a contact system at clayey soils under conditions of their overwetting and heaving. The method to reinforce a railroad bed consists in treatment of railroad bed soils with a reinforcing composition of a hydraulic binder, a mineral adsorbent and water with their subsequent compaction till full covering of ballast prism soil particles with a reinforcing composition. Treatment of earth bed soils with a reinforcing composition is carried out in the upper layer of a ballast prism. The reinforcing composition is taken in the amount of 8-12% from the ballast prism volume. A hydraulic binder in the reinforcing composition is brucite lime. A mineral adsorbent is brucite chaff.
EFFECT: increased period of TS stability during the whole normative time of its interrepair life, realisation of soil reinforcement process without removal of rail and sleeper grid.
1 tbl
| Title | Year | Author | Number | 
|---|---|---|---|
| REINFORCING GROUND COMPOSITION | 2003 | 
 | RU2236504C1 | 
| METHOD OF GROUND CONSOLIDATION | 2001 | 
 | RU2192517C2 | 
| GROUND CONSOLIDATION COMPOSITION AND METHOD OF ITS USAGE FOR ROAD BUILDING | 2005 | 
 | RU2281356C1 | 
| DRAINAGE SYSTEM | 2010 | 
 | RU2449084C1 | 
| METHOD FOR STRENGTHENING THE MAIN PLATFORM OF THE RAILWAY ROADBED | 2021 | 
 | RU2766844C1 | 
| COMPOSITION FOR SOIL STABILIZATION | 2019 | 
 | RU2717592C1 | 
| METHOD TO REINFORCE RAILWAY TRACK | 2010 | 
 | RU2448212C2 | 
| METHOD FOR REINFORCING RAILWAY ROADBED IN THE AREA OF JUNCTION WITH AN ARTIFICIAL STRUCTURE | 2020 | 
 | RU2752888C1 | 
| METHOD TO REINFORCE RAILWAY TRACK | 2013 | 
 | RU2535378C1 | 
| METHOD TO STRENGTHEN SLOPES OF EARTH BED | 2012 | 
 | RU2507343C2 | 
Authors
Dates
2011-06-27—Published
2009-12-11—Filed