FIELD: construction.
SUBSTANCE: old ballast placed to the level of the main site is cut out. The remaining underlying uncleaned used crushed stone in the level of the main site is levelled, geotextile is laid, ballast material is filled in layers on top and compacted. The ballast prism is finished. After levelling of the crushed stone they introduce cellular concrete of normal hardening by pouring into it, and cellular concrete of normal hardening is applied onto the surface of the ballast prism.
EFFECT: reduced quantity of process operations and reduced harmful effect at environment.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO REINFORCE RAILWAY TRACK | 2010 |
|
RU2448212C2 |
METHOD FOR STRENGTHENING THE MAIN PLATFORM OF THE RAILWAY ROADBED | 2021 |
|
RU2766844C1 |
BULK GEOGRID LAYING MACHINE | 2012 |
|
RU2521171C2 |
MACHINE TO LAY GEOSYNTHETIC MATERIALS INTO UNDERBALLAST LAYER OF RAILWAY GROUND WORK WITHOUT REMOVAL OF RAIL AND SLEEPER GRID | 2010 |
|
RU2477349C2 |
METHOD TO REPAIR UNDERBALLAST LAYER OF RAILWAY TRACK | 2010 |
|
RU2422579C1 |
METHOD TO RESTORE UNDERBALLAST LAYER OF RAILWAY TRACK | 2010 |
|
RU2422578C1 |
FORMATION AND COMPACTION METHOD OF BALLAST SECTION OF RAILWAY | 2014 |
|
RU2545133C1 |
THE COMPOSITION OF THE MIXTURE TO CREATE A SUB-BALLAST PROTECTIVE LAYER OF THE ROADBED | 2022 |
|
RU2791626C2 |
METHOD FOR FORMING A SUB-BALLAST PROTECTIVE LAYER AND A SET OF TRACK MACHINES FOR ITS IMPLEMENTATION | 2022 |
|
RU2776165C2 |
0 |
|
SU67036A1 |
Authors
Dates
2014-12-10—Published
2013-06-25—Filed