FIELD: information technologies.
SUBSTANCE: server of a switching centre of a mobile communications service (MSC) with realisation of route selection function, includes a module of call control, a routing module and a memory module, besides, the module of call control is used to receive a call from a gateway GW of an incoming side and to control a network gateway (MGW) on the way of this signal for its transfer in compliance with this information; the routing module is used to calculate a parameter of workload extent of each route according to parameters established by a network administrator, number of resource configurations and volume of resource occupation; to select a least occupied route as a transfer route and to send information on a transfer route to the call control module; a memory module is used to store parameters of route configuration.
EFFECT: optimised strategy of route selection.
10 cl, 6 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD AND APPARATUS FOR MANAGING OVERLOAD | 2009 | 
 | RU2510143C2 | 
| MOBILE COMMUNICATION METHOD AND SYSTEM | 2011 | 
 | RU2531543C1 | 
| INTERNATIONAL CONVERGED MOBILE COMMUNICATION SERVICES | 2014 | 
 | RU2724323C2 | 
| METHOD, SYSTEM AND MEDIA-GATEWAY TO IMPLEMENT CONSOLIDATION OF MOBILE COMMUNICATION SWITCHING CENTRES | 2007 | 
 | RU2418386C2 | 
| RESOURCE POOLING IN ELECTRONIC BOARD CLUSTER SWITCHING CENTRE SERVER | 2008 | 
 | RU2507703C2 | 
| HANDOVER DELAY OPTIMISATION | 2010 | 
 | RU2576474C2 | 
| OPTIMIZATION OF HANDOVER DELAY | 2010 | 
 | RU2696338C2 | 
| SERVICE TRANSFER BETWEEN SIP NETWORK AND CELLULAR COMMUNICATIONS SYSTEM | 2005 | 
 | RU2380840C2 | 
| METHOD TO DISCONNECT CALL AND METHOD OF ITS IMPLEMENTATION | 2009 | 
 | RU2473188C1 | 
| METHOD OF SUBSCRIBERS CONNECTION AND DEVICE FOR IMPLEMENTATION THEREOF | 2020 | 
 | RU2740299C2 | 
Authors
Dates
2011-06-27—Published
2006-12-29—Filed